Example. Outside (Car Park and seating). Wall A. 4.2m. 1.3m. Wall D. Wall B. 2.1m. Offices. 1.1m. Waiting Area (not attended). 3.8m. Operator Area. Wall C. Distance to ceiling from table – 2m Offices on floor above. Corridor. not drawn to scale. Example – Exposure Details.

antiones
Download Presentation

Example

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Example Outside (Car Park and seating) Wall A 4.2m 1.3m Wall D Wall B 2.1m Offices 1.1m Waiting Area (not attended) 3.8m Operator Area Wall C Distance to ceiling from table – 2m Offices on floor above Corridor not drawn to scale

  2. Example – Exposure Details • Only two investigations in this room • AP Abdomen (patient supine on table) • DAP – 6.5 Gy.cm2 • 30 examinations per day • AP Pelvis (patient supine on table) • DAP – 5.5 Gy.cm2 • 20 examinations per day • All exposures at 100 kV • Room in use 5 days per week, 52 weeks per year

  3. Calculation required • Thickness of lead required to shield walls adequately (specify as lead code). • Thickness of concrete required to shield ceiling adequately. • (note, this is a ground floor room with no basement) • Assuming a dose constraint of 0.3mSv per annum

  4. X-ray transmission through lead

  5. X-ray transmission through concrete

  6. Coefficients for empirical formula at 100 kV