Project Overview – December 2013

Project Overview – December 2013. Point Thomson IPS Project. Project Overview. PTU-15 & PTU-16 Lease. Project Scope Producing 10 KBD c ondensate and cycling 200 MCFD of gas One production well on West Pad, 2 injection wells on Central Pad

amber
Download Presentation

Project Overview – December 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Overview – December 2013 Point Thomson IPS Project

  2. Project Overview • PTU-15 & PTU-16 Lease • Project Scope • Producing 10 KBD condensate and cycling 200 MCFD of gas • One production well on West Pad, 2 injection wells on Central Pad • Production facilities, camp, airstrip, infield roads • 12” Liquids export pipeline tying into Badami Sales Oil Pipeline • 8” gathering line from West Pad to Central Pad • Current Status • Engineering and CPI Procurement nearing completion • Central Pad gravel fill and infrastructure work progressed • Over 2200 pipeline supports installed • Service Pier, Diesel Storage, Permanent Operations Camp, and Air Strip installed and operating Central Pad October 2012 Central Pad May 2013

  3. Schedule Highlights Permanent Operations Camp, Air Strip, Service Pier, Pipeline Supports, and initial Central Pad Gravel and Sea Lift Bulkhead work complete Engineering and CPI Procurement nearing completion Sea Lift Module fabrication in progress at HHI; Switchgear Module fab in progress; Truckable Fab. Award imminent Winter 2014 scope: Ice Road; Install Export Pipeline; complete Sea Lift Bulkhead; mining and gravel placement for pads and roads; install 3 bridges

  4. July Site Photos Central Pad Pipeline VSMs Service Pier Airstrip

  5. Current Temp: 23oF / -5oC • Wind Chill: 12oC / -11oC • Low Temp: -50oF / -46oC

  6. Point Thomson Project Contractors Naniq Logistics Kuukpik Tikigaq Ryan Air Ukpeagvik (UIC) Carlile Totem Ocean Express Umiaq Big Horn Trucking NAC Port of Anchorage NMS CIRI / Cruz Marine AK AK Railroad Co. Sourdough Express Crowley Marine AK Airlines Bowhead Transportation Everts Air Cargo Bowhead / Crowley Lynden Samson Tug & Barge ATS APL Peak Oilfield Services Lone Star Northstar Terminal & Stevedore Co. Rickmers Lynden Transport / LAC Landstar Horizon Lines Chipolbrok CH2MHill Valmont Asiana ASRC CB&I Lynden Maersk Seven Sisters BBC Jesse Engineering ATS Nanuq Universal Welding ICE Services Flowline Alaska Alaska Power ERM Builders Choice Inc. Kumin ABR NANA Construction Dryden & Lerue RSA SLR SSD Morris Engineering Group LGL Tyco

  7. Project Vision