1 / 6

Electronics for LINAC4

Electronics for LINAC4. benjamin.todd@cern.ch. 0v4. Electronics for LINAC4. there are many things which make accurate reporting on LINAC4 and on RegFGC3 impossible. Hugues list – it’s impossible to correlate with complete certainty

amara
Download Presentation

Electronics for LINAC4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electronics for LINAC4 benjamin.todd@cern.ch 0v4

  2. Electronics for LINAC4 there are many things which make accurate reporting on LINAC4 and on RegFGC3 impossible Hugues list – it’s impossible to correlate with complete certainty G:\Departments\TE\Groups\EPC\Projects\RegFGC3\meeting\meeting-RegFGC3-2014-02-01\ • Greg and Michele have • reverse engineered the list… • matched the line items to DAIs • discovered that some expected items are not in the pipeline 2) Basic principles – the required electronics per converter is not correct in EDMS https://edms.cern.ch/nav/P:CERN-0000076207:V0/P:CERN-0000076207:V0/TAB3 3) Basic principles – no attention has been paid to tracking who has what and where it is • I know how many parts should be at CERN • I don’t know whether they are functional or faulty • I don’t know who has them

  3. In a nutshell Myselfand Greg wrote a spec for a new framework for production tracking Agreed by David, Michele, Jean-Paul, in progress with EPC/OMS • Until we sort these basics, the only way we can work is “emergency mode”, • I deal with the most urgent thing as and when it arrives • I count on project / converter responsible to keep me straight N.B. we have >100 FGC3 which are available, barcodes and IDs to be validated Most Urgent = SERGE VS State Control VS measurement VS Digital regulation VS Analogue Interlock VS Analogue Interlock Mezzanine x 100 x 40 x 40 x 100 x 100 completed being tested by HPM being tested by CCE stuck stuck

  4. MSC-GE  J-TEQ end May: group decision, proceed with V5, close LINAC4 project production start June: I confirmed the order with MSC-GE, who accepted it July: MSC-GEceased trading August: J-TEQ came into being, charged with continuing MSC-GE’s work No reply to any emails, phone-calls with this new company so far. Greg and I have began contingency to make more of these boards

  5. Analogue Interlock v5 + Mezzanine * the BoM for the mezzanine is incorrect for the converter-specific resistors For the both the main board and for the mezzanine * the ERNI connectors used have a 105 day lead time * No stock at any re-seller We need to urgently make a plan with regards to these two boards…

More Related