report on tilecal commissioning january 25 2006
Download
Skip this Video
Download Presentation
Report on TileCal Commissioning January 25, 2006

Loading in 2 Seconds...

play fullscreen
1 / 11

Report on TileCal Commissioning January 25, 2006 - PowerPoint PPT Presentation


  • 89 Views
  • Uploaded on

Report on TileCal Commissioning January 25, 2006. Team 1: installation, services... Team 2: repairs Team 3: ”routing the last 20 meters of cables”, USA15 connection, finger connections, LVPS insertion, DCS monitoring Team 4: commissioning of superdrawers, take data using MobiDaq. Team 5.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Report on TileCal Commissioning January 25, 2006' - altessa


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2
Team 1: installation, services...
  • Team 2: repairs
  • Team 3: ”routing the last 20 meters of cables”, USA15 connection, finger connections, LVPS insertion, DCS monitoring
  • Team 4: commissioning of superdrawers, take data using MobiDaq
team 5
Team 5
  • Led by Kerstin and Martina Hurwiz
  • Analyse ALL commissioning data as they come  team 5 shifts

(1am1pm Stockholm, 1pm1am Chicago)

e.g. 3 runs to check on Tuesday

2 long runs taken during

the week end.

  • In depth analysis of problems,

feedback to hardware folks

commissioning data
Commissioning data
  • Pedestal runs
  • Charge injection scan
  • Constant charge injection
  • LED/laser: light pulse injected into the PMT
  • Physics/cosmics
pedestal runs
Pedestal runs
  • Pedestal, noise,

coherent noise ...

Low and high freq. Noise (Kerstin)

Coherent noise: look at covarariance matrix for the 48 channels (Ulla)

single charge injection runs monocis
Single charge injection runs (”MonoCIS”)
  • Inject a defined and constant charge before the shaper, only done on the low gain (why?)
  • Find non responding (dead channels)
  • Check stability over time (long runs over the week end)
slide7
This run looks good!

Long run (60051) over the week end: problems in module C47 (Kerstin)

charge injection scan
Charge injection scan
  • Inject increasing charges into the shaper
  • Stuck bits,
  • Check linearity
  • Compute gains
  • Check pulse shapes
  • Reconstructed pulse height vs phase
outlook
Outlook
  • Increase productivity: efficient ways to look at commissioning runs for team 5 shifters
  • Define specific analyses and assign to various folks
  • Make available tools to be able to look at this data in new ways, access all relevant information (eg DCS)