Procurement of the 10TBq 137Cs Source, Irradiator and Filters

GIF++ The new Gamma Irradiation Facility at CERN. Physics Department. Detector Technology Group. Procurement of the 10TBq 137Cs Source, Irradiator and Filters. GIF 137Cs at start: 740 GBq Other characteristics of 137 Cs remain: Half-life: 30.17 y

aliza
Download Presentation

Procurement of the 10TBq 137Cs Source, Irradiator and Filters

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup Procurement of the 10TBq 137Cs Source, Irradiator and Filters GIF 137Cs at start: 740 GBq Other characteristics of 137Cs remain: Half-life: 30.17 y Beta decay (gamma emission 662 keV) Inquiries carried out in 2009 suggest that the cost of the whole system will be around 300-400 K Given that cost > 200K, a market survey (1+ 2 weeks) followed by an invitation to tender (2 + 4 + 1 weeks) is necessary before contract is awarded. Procurement responsible: R.Fortin (PH-DT) with vital contributions of CERN Safety and Procurement services R. Fortin PH-DT-DI

  2. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup Criteriaedefined in 2009 • The source was described as: • Single 10 TBq137Cs source with it’s “Type B” travel container • << for transportation, fixation, use and service, in case the source will not supplied by the same firm than the radiator and/or on different timescales >> • The irradiator was described as: • One fully functional irradiator with it’s remote control console • << “Main” panoramic collimator, “Secondary” rear collimator, axis @ 150 cm above the ground, Dose Rate monitors to control the functionality, control room distance 30m… >> • The radiation filters were described as: • One filter system • << Remote controlled programmable, four vertical slides, attenuation ≥ 1:1 - 10,000:1 >> • Retrieval of the old irradiator… • This is an option of the specifications document R. Fortin PH-DT-DI

  3. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup Replies received in 2009 • - Three well-established firms (FR+CH+DE) showed interest to provide CERN with the future irradiator of GIF++ after the market survey of 2009. • - The three firms individually presented their project as a package where the Irradiator, Source and Controls were combined according to our specifications document SPSC-P-339. • These 3 candidates were asked to update and reiterate their proposals. • - Two bidders need to reengineer their project • - As soon as finalized, our updated specifications document will be sent to current and all potential candidates. • Today only one candidate fulfills our requirements! R. Fortin PH-DT-DI

  4. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup Lateral view of the irradiator and H4 Beam line Top view of the irradiator and H4 Beam line R. Fortin PH-DT-DI

  5. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup The irradiatorshownwithbothbeamsinside the bunker m-beam R. Fortin PH-DT-DI

  6. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup • The 137Cs Source: • (compressed pellets of Caesium chloride) • Info : nuclitecGmbH • - Shape of capsule: RSL6030 (∅21.3 x L26.4mm outer dimensions) • - The source has a double encapsulation of stainlesssteel • - The source comes in a stainlesssteelholderaccording to ISO 4037-1 • - Country of origin : Russia ( according to our candidates ) • - Nominal Activity : 200 Ci (± 20%) • - CERN RP willensurethat the manufacturer of the source applies ISO 2919 • Such137Cs sources have a delivery time of 8 to 12 months ! R. Fortin PH-DT-DI

  7. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup • Conclusion • Procurement plan key dates: • - Sept 1st, 2012 for order sent out, • - 3rd quarter 2013 for delivery. • ( the full system in GIF++ area ) • This scheduleallowsto commission the facilityconfortably. R. Fortin PH-DT-DI