1 / 39

HEPOS A look at the Transformation Between the ETRF and the Greek Reference Geodetic System

HEPOS A look at the Transformation Between the ETRF and the Greek Reference Geodetic System. INF -2357. Vaios Balis – Christos Liapakis Geotech Ltd. Projects’ identification. Supervising authority: KTIMATOLOGIO SA

aletta
Download Presentation

HEPOS A look at the Transformation Between the ETRF and the Greek Reference Geodetic System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HEPOSA look at the Transformation Between the ETRF and the Greek Reference Geodetic System INF -2357 Vaios Balis – Christos Liapakis Geotech Ltd

  2. Projects’ identification • Supervising authority: KTIMATOLOGIO SA “… responsible for the design, implementation and operation of the Greek Cadastral” • Projects: • HEPOS-SUPPLY • HEPOS-MEAS • Projects co-financed by the European Union under the operational programme “Information society”

  3. HEPOS SUPPLY • “Supply, installation and maintenance of the fully operational and turnkey HEllenic POsitioning System – HEPOS” • Contractor: Trimble Europe B.V. • Sub-contractors • Geotech Ltd • Site Location • Installation • Operation support • OTENET SA • Communication provider

  4. HEPOS SUPPLY • Reference stations: 100 (± 5) • Duration of the project: 2 years • Installation : 7 months • Site location • Reference station installation • Control center installation • Communications

  5. HEPOS SUPPLY

  6. HEPOS SUPPLY • 98 stations • 2 networks • 11 single RS • ETRF-2005

  7. GGRS 87 • Greek Geodetic Reference System 1987 • Parallel to WGS 84 • Accuracy ~ 1 x 10-5 • Origin offset from WGS • +199.723 m • -74.030 m • -246.018 m • Projection • Transverse Mercator • Central Meridian: 24º • Scale along central Meridian: 0.9996

  8. HEPOS MEAS – Scope of the work • “GPS measurements on control points of the Greek National Triangulation Network and calculation of their coordinates in HEPOS reference system (ETRF 2005, epoch 2007.5)” • “Calculation of 7-parameter transformation from HEPOS reference system to GGRS 87 and vice versa” • Contractor: JV Ceotech – Topomet • Duration : 10 months !!!!

  9. Points to be measured • How many points per 1:50000 scale map sheet ? 1:50000 scale map sheet ~ 28 km ~ 22 km

  10. 1:50000 scale map sheets • How many 1:50000 map sheets ?

  11. Total number of points • How many points ? • 8 per each map sheet 1:50000 scale • 387 1: 50000 scale map sheets • or roughly 2800 points to be measured

  12. Specifications • L1/L2 GPS receivers • Occupation time: 1 hour • Logging interval: 15 sec • Elevation mask : 15º • 6 satellites tracked : 90% of session time • PDOP < 4 : 75% of session time • 1 Primary base station – REF (24 hours logging) • 1 Secondary base station – SEC (logging until all 8 points of the map sheet have been measured)

  13. GPS measurements

  14. Resources • 10 survey crews • 2 people per survey crew • 5800 L1/L2 receivers with ACU • Handheld GPS for Guidance • Cameras for documentation • 4 WD for transportation • Daily data transfers to the office • 3 months field work • 9 months office work

  15. Pre-survey office work

  16. Some measured points

  17. Some non measured points

  18. Total measured points 2470 points

  19. Measured point documentation

  20. TGO projects 128 TGO projects

  21. 7 parameter transformation • TTC SW

  22. Transformation residuals

  23. Transformation accuracy • 1:50000 scale map sheets • Horizontal • Mean value = ± 3 cm • Max Value = ± 5 cm • Vertical • Mean value = ± 6 cm • Max Value = ± 8 cm

  24. Transformation accuracy • 1:100000 scale map sheets • Horizontal • Mean value = ± 6 cm • Max Value = ± 9 cm • Vertical • Mean value = ± 10 cm • Max Value = ± 17 cm

  25. 7 parameter transformation (global) • TTC SW

  26. Residuals

  27. Residuals – North Greece

  28. Residuals - Islands

  29. Residuals – West Greece

  30. Residuals – Central Creece

  31. Residuals – North East Greece

  32. Shift grid files

  33. Shift grid files

  34. Geoid

  35. Accuracy

  36. Survey controller application

  37. Thank you for your attention…

  38. Questions

More Related