Solar Panel Team. Matthew Ayre (project manager) Hyan Choi (lead consultant). Why??. In order to save electricuty (bills) Reduce effect of business on the environment Prove that the technology for such a venture exists. Concept Overview. Solar Panel Feasibility.
E N D
Solar Panel Team Matthew Ayre (project manager) Hyan Choi (lead consultant)
Why?? • In order to save electricuty (bills) • Reduce effect of business on the environment • Prove that the technology for such a venture exists
Solar Panel Feasibility • There must be enough power to allow the network of PCs to function correctly • This will be made possible by the other energy source and the low power usage PCs • The installation and after must not cause serious harm to anyone
Side view • This diagram show how we had planned to attach the panel • It shows the rails • Bolts • And subsequently where we had to drill holes
Test Results Weather Condition: Sunny Table 1 Solar panel output result