FY 2010 Port Security Grant Program. Grant Guidance Outreach Grant Programs Directorate and United States Coast Guard. December 2009. Table of Contents. Overview Application Post-Award Resources Environmental Planning and Historic Preservation (EHP) Compliance. Overview.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'FY 2010 Port Security Grant Program' - MikeCarlo


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

FY 2010 Port Security Grant Program

Grant Guidance Outreach

Grant Programs Directorate and United States Coast Guard

December 2009

table of contents
Table of Contents

Overview

Application

Post-Award

Resources

Environmental Planning and Historic Preservation (EHP) Compliance

fy 2010 transportation grant programs

Overview

FY 2010 Transportation Grant Programs
  • The FY 2010 Port Security Grant Program (PSGP) is one of five grant programs within the Transportation Infrastructure Security Branch (TISB)

Transportation Infrastructure Security Branch (TISB)

Intercity Bus Security Grant Program

(IBSGP)

Port Security Grant Program

(PSGP)

Transit Security Grant Program

(TSGP)

Freight Rail Security Grant Program

(FRSGP)

Intercity Passenger Rail

(IPR)

fy 2010 psgp

Overview

FY 2010 PSGP
  • Authorizing Statutes
    • Department of Homeland Security Appropriations Act, 2010 (Public Law 111-83)
    • Section 102 of the Maritime Transportation Security Act of 2002, as amended (46 U.S.C. §70107)
  • Period of Performance: 36 months

(p. 7)

fy 2010 psgp key updates

Overview

FY 2010 PSGP Key Updates
  • No required cost sharing, matching, or cost participation
  • Management and Administration (M&A) capped at 5% for grantees and 3% for sub grantees(p. 22)
  • Investment Justifications (IJ) for Group I and II due 45 business days (April 19, 2010) after application deadline(p. 19-20)
  • No designated Ferry appropriation(p. 9)
    • Ferries in Group I and II apply through designated FA
    • All other Ferries apply with Group III and All Other Port Areas
  • Changes in allowable costs(p. 22-34)
    • Funding for standard operations vehicles utilized for routine duties, such as patrol cars and fire trucks, is no longer allowable
    • Funding for conducting vulnerability assessments to evaluate and make recommendations with respect to security is no longer allowable
fy 2010 psgp funding priorities

Overview

FY 2010 PSGP Funding Priorities
  • Enhancing Maritime Domain Awareness (MDA)(p. 22)
    • Reflect regionalized approach, projects doing more than for just one port
    • Allows leaders to make effective decisions and act early against threats
    • Examples of projects: credentialing, communications, and enhanced intelligence sharing and analysis
  • Enhancing Improvised Explosive Device (IED) and Chemical, Biological, Radiological, Nuclear, Explosive (CBRNE) prevention, protection, response, and recovery capabilities(p. 23)
    • Of particular concern are IEDs delivered via small craft, underwater swimmers, or on ferries
  • Training and Exercises Must follow Area Maritime Security Training Exercise Program or the TSA ISTEP guidelines that test operational protocols(p. 24)
    • For clarification, visitwww.hseep.dhs.gov or email hseep@fema.gov
  • Efforts supporting implementation of the Transportation Worker Identification Credential (TWIC)(p. 23)
    • Congressionally mandated security program for using secure ID cards for individuals requiring unescorted access to port facilities
basic eligibility requirements

Overview

Basic Eligibility Requirements
  • Must be fully compliant with relevant Maritime Security Regulations (33 CFR Parts 101-106, MTSA Regulations) (p. 8)
  • Must implement the National Incident Management System (NIMS) (p. 14)
  • Congress directed the Department of Homeland Security (DHS) to apply the funds to the highest risk ports (p. 9)
    • There are a total of 147 port areas aggregated into 91 discreet port funding areas eligible to apply for funds identified for each of the four PSGP funding pools
  • There is no longer a separate 5th funding pool for Ferry Systems

Funding Pools

Group I

Group II

Group III

All Other Port Areas

fy 2010 psgp timeline
*Completed applications must be received on Grants.gov no later than

11:59pm EST, Friday, February 12, 2010

Overview

FY 2010 PSGP Timeline

Application

Period Opens

FA Decision Due Date

Application

Due Date

IJ Submission (Groups I and II)

Award Announcement

December 8, 2009

December 31, 2009

February 12, 2010

April 19, 2010

on or before

September 30, 2010

the fiduciary agent fa model p 15

Overview

The Fiduciary Agent (FA) Model(p. 15)
  • Group I and II port areas must continue with the FA process and can either retain their current FA or select a new FA to deal specifically with FY 2010 award
  • Newly identified Group II port areas can begin the FA process and select a FA or opt out of the FA process
  • Group IIIs and All Other Port Areas do not need an FA and apply directly to FEMA

FAs with approved PWRP

Submit Investment Justifications that align with approved Port Wide Risk Management Plan (PWRP)

Submit IJ that align with respective Area Maritime Security Plan (AMSP), Facility Security Plan (FSP), or Vessel Security Plan (VSP)

FAs without approved PWRP

how do i apply

Application

How do I apply?
  • All eligible entities must apply for funding through www.grants.gov
    • Questions call (800) 518-4726; see Grants.gov FAQ Handout
  • To access application:
    • Select “Apply for Grants,” then “Download Application Package”
    • Enter CFDA number (97.056) and/or the Funding Opportunity Number (DHS-10-GPD-056-000-01 )
    • Select “Download Application Package,” and follow prompts to download application package
  • To access instructions:
    • Select “Apply for Grants,” then “Download Application Package,” then “Instructions”
  • DUNS® Number
    • Verify have DUNS number, or take the steps necessary to obtain one ASAP
    • Applicants can receive a DUNS number at no cost by calling the DUNS number request line at (866) 705-5711
  • Valid Central Contractor Registry (CCR) Registration
    • Must confirm CCR registration at http://www.ccr.gov
  • Completed applications must be received on Grants.gov by no later than 11:59pm EST, Friday, February 12, 2010
application components p 18

Application

Application Components (p. 18)
  • IJ for projects
  • Detailed Budget(s) containing only allowable costs
  • MOUs/MOAs (if applicable)
  • EHP Details (if available)
  • Standard Forms (SF) (http://www07.grants.gov/agencies/forms_repository_information.jsp)
    • SF-424, Application for Federal Assistance
    • SF-424A, Budget Information
    • SF-424B, Assurances
    • SF-424C, Budget Information – Construction Form
    • SF-424D, Assurances – Construction Programs
    • SF-LLL, Disclosure of Lobbying Activities
    • Lobbying Form – Certification Regarding Lobbying 
    • Certification Regarding Debarment, Suspension, and Other Responsibility Matters
    • Certification Regarding Drug-Free Workplace Requirements
investment justifications ij p 19 20

Application

Investment Justifications (IJ) (p. 19-20)
  • Address each initiative being proposed for funding
    • Demonstrate how projects address gaps and deficiencies in current programs and capabilities
    • Demonstrate ability to provide enhancements consistent with the purpose of the PSGP program
  • Separate IJ for each proposed project
    • Applicants within Group III or All Other Port Areas may apply for up to three projects
    • Due to nature of FA process, FAs are not limited to three projects
  • All IJs must be consistent with all applicable requirements outlined in guidance
  • IJ components:

1. Background

2. Strategic and program priorities

3. Impact

4. Funding and Implementation Plan

  • IJ template provided in Part VIII of guidance
detailed budget p 20 21

Application

Detailed Budget (p. 20-21)
  • Template provided in Part VIII of guidance (titled “Budget Detail Worksheet”)
    • While the format is not required, it is highly recommended that applicants use the template
      • Cost categories are required
      • Include quantity and cost
  • SF 424A/C (Grants.gov forms) do not replace the Detailed Budget requirement  both the Detailed Budget AND the SF424 A/C must be submitted with the application
  • Budget must be complete, reasonable, cost-effective, and provide the appropriate level of detail to clarify intent
  • Budget provides the basis of computation of all project-related costs (including M&A) and any appropriate narrative
allocation announcement award notification

Application

Allocation Announcement & Award Notification
  • Final allocations are first announced by the Secretary no later then 60 days after the close of the application period
    • An Information Bulletin (IB) is distributed and includes a list of allocations to those entities receiving awards
    • The IB is sent out through AskCSID and posted to FEMA and HOMEPORT websites
  • Official awards are made on a rolling basis and grantees receive an electronic notification on or before September 30, 2010(p. 36)
  • Grantees must officially accept award upon notification
    • Email includes instructions on how to access the award
    • Contact the GMS Help Desk to obtain username and password: 1-888-549-9901
financial and programmatic reporting p 46 49

Post-Award

Financial and Programmatic Reporting (p. 46-49)
  • Federal Financial Reports (FFR) are required quarterly SF-425
    • SF-425 replaces the SF-269
    • Must be filed online through the PARS website
    • Reporting periods and due dates:
      • October 1 through December 31, due January 30
      • January 1 through March 31, due April 30
      • April 1 through June 30, due July 30
      • July 1 through September 30, due October 30
  • Financial and Compliance Audit Report – it is suggested to keep financial information 3 years after award closeout
  • Semi-Annual Progress Report (SAPR)
    • Formerly titled CAPR
    • Reporting periods and due dates:
      • January 1 through June 30, due July 30
      • July 1 though December 31, due January 30
slide17

Resources

VA

HI

PSGP Program Analyst State Assignments

Kathleen Steinle

Kathleen.Steinle@dhs.gov

(202) 746-5652

Venita Lane

Venita.Lane@dhs.gov

(202) 786-9470

Rene Phillips

LurrandaRene.Phillips@dhs.gov

(202) 786-9735

Jackie Jackson

Jacqueline.Jackson1@dhs.gov

(202) 786-9513

Alex Berberian

Alexander.Berberian@dhs.gov

(202) 786-9474

Duane Davis

Acting Section Chief

Duane.Davis@dhs.gov

(202) 786-9533

Jeff Hall

Jeffrey.Hall1@dhs.gov

(202) 786-9778

AK

WA

I

ME

X

VT

MT

ND

NH

I

MN

OR

VIII

II

WI

MA

NY

ID

SD

MI

RI

WY

CT

PA

V

IA

NJ

NE

III

NV

OH

VII

IN

IL

IX

DE

UT

WV

WV

CO

MD

KS

MO

CA

KY

NC

TN

AZ

OK

IV

SC

AR

NM

GA

VI

AL

MS

TX

Guam

Northern Mariana Islands

American Samoa

LA

Puerto Rico

FL

Tier I Port Area

Virgin Island

environmental planning and historic preservation ehp compliance p 43 45
Environmental Planning and Historic Preservation (EHP) Compliance (p. 43-45)

EHP Compliance

what is an ehp review

EHP Compliance

What is an EHP Review?
  • Involves an analysis of pertinent project information used to determine the appropriate amount of documentation required for EHP compliance
  • All projects funded with Federal grant dollars must comply with EHP laws, regulations, and Executive Orders
  • Projects must be EHP approved before initiation
  • GPD certifies that a grant-funded project is in compliance with applicable EHP laws, regulations, and Executive Orders
  • Complex projects will typically require more information to reach a determination
ehp laws and executive orders

EHP Compliance

EHP Laws and Executive Orders

ExecutiveOrders:

Endangered Species Act

Environmental Justice

National Historic

Floodplains

Preservation Act

Wetlands

NEPA

Clean Air Act

Coastal Barrier

Clean Water Act

Resources Act

Resource Conservation &

Coastal Zone

RecoveryAct

Management Act

what are ehp considerations
Endangered Species

Cultural Resources

Historic properties

Archaeological sites

Air and Water Quality

Noise

Fish, Habitat & Wildlife

Floodplains

Wetlands

Coastal Zones

Agricultural Lands

Environmental Justice

Socioeconomic Resources

Land Use

Hazardous Materials

Traffic

Geology (Topography, Soils)

EHP Compliance

What are EHP Considerations?
floodplains and wetlands

EHP Compliance

Floodplains and Wetlands
  • Avoid to the extent possible adverse impacts to wetlands and actions within or affecting floodplains
  • If there is a reasonable alternative outside the wetland or floodplain, FEMA will not fund the project within the wetland or floodplain
  • If the project impacts or may impact wetlands or a floodplain you should submit:
    • Section 404 and Section 10 permits (Wetlands)
    • National Wetlands Inventory Map showing project location

http://www.fws.gov/wetlands/Data/mapper.html

    • FEMA Flood Insurance Rate Map (FIRM) showing project location

http://www.fema.gov/hazard/map/firm.shtm

coastal zone management act czma

EHP Compliance

Coastal Zone Management Act (CZMA)
  • Goals:
    • Reduce uncontrolled development on islands, beaches, salt marshes, transitional or inter-tidal areas, and other coastal areas
  • Applicability:
    • States with a shoreline in the coastal zone or ones that border the Great Lakes
    • All states in the coastal zone have a Coastal Zone Management Plan (CZMP)
    • Be aware of the states CZMP and ensure that your project is in compliance
importance of compliance

EHP Compliance

Importance of Compliance

Compliance

Non-Compliance

  • Protection of natural and cultural resources
  • Improved project planning
  • Cost efficient
  • Programmatic and financial compliance
  • Efficient project implementation
  • Improved community relations
  • Project delays
  • De-obligation of funding
  • Negative publicity
  • Civil penalties
  • Lawsuits
gpd ehp review process

EHP Compliance

GPD EHP Review Process
  • Grantees are responsible for providing all relevant EHP materials to GPD
  • Grant funds may be used for preparation of EHP documentation
  • FEMA may be required to consult with State Historic Preservation Office (SHPO), the U.S. Fish and Wildlife Service (FWS), etc.
roles and responsibilities
Roles and Responsibilities

Grantees

Responsible for EHP compliance

Submittal of all EHP review packets to GPD

GPD Program Analysts (PA)

Point of contact between the grantee, GPD-EHP Team, and Regional Environmental Officer (REO)

Approval of projects with no potential for environmental and/or historic preservation impacts (Type A)

EHP Compliance

roles and responsibilities29
Roles and Responsibilities

GPD-EHP Team

Point of contact for PAs and REOs

Approval of projects with no potential for environmental and/or historic preservation impacts if certain conditions apply (Type B)

REO

Review and approval of project with potential for environmental and/or historic preservation impacts (Type C)

Responsible for State Historic Preservation Office (SHPO) consultation, with the assistance if necessary from GPD

Liaison with grantees and GPD

EHP Compliance

type a projects

EHP Compliance

Type A Projects
  • Projects with no potential for environmental and/or historic preservation impacts:
    • Planning
    • Classroom-based training and exercises
    • Field-based training at existing facilities with established procedures
    • Personnel
    • Mobile and portable equipment (PPE, radios, etc.), vehicles, and other equipment that does not require any installation
type b projects

EHP Compliance

Type B Projects
  • Projects with no potential for environmental and/or historic preservation impacts if certain conditions apply
  • Examples include:
    • Physical security enhancements
    • Equipment installation (structures less than 50 yrs old)
        • e.g. physical security/access controls
  • Typical questions
    • Does the project involve new ground disturbance or clearance of vegetation?
    • Does project utilize existing infrastructure?
    • Will work occur in the vicinity of historicproperties?
    • Will work occur in or near water?
type c projects

EHP Compliance

Type C Projects
  • Projects that may have the potential for environmental and/or historic preservation impacts:
    • Additional analysis and documentation may be required to adequately address the impacts in compliance with applicable EHP laws and regulations
    • Environmental Assessments (EAs), Biological Assessments (BAs), or Memoranda of Agreement (MOAs) may be required
    • Public involvement may be required
type c example modification of buildings structures 50 years old

EHP Compliance

Type C Example: Modification of Buildings & Structures 50 + Years Old
  • Equipment installation (e.g. physical security/access controls) on, in, or in the vicinity of historic buildings, piers, bridges, etc.
  • Building renovation/hardening (e.g. doors, gates, windows)
ehp review packet

EHP Compliance

EHP Review Packet
  • A complete EHP review packet will provide the necessary information to expedite the EHP review
  • What are the required contents?
    • Detailed project description
    • Physical address of structure/facility or lat/long
    • Clear color photographs (ground-level and aerial)
    • Dimensions/acreage/square footage of structure and/or land affected
    • Extent and depth of ground disturbance for:
      • New construction and structure modification
      • Utility line placement
      • Fencing, light posts, etc., installations
    • Height of communication towers
    • Special equipment being used, staging areas, etc.
    • Year building or structure was built (to include buildings or structures that are in the vicinity)
gpd ehp updates

EHP Compliance

GPD EHP Updates
  • CSID point of entry for all EHP review packets
  • Programmatic Environmental Assessment (PEA)
  • Screening Memo (see CD)
  • Authorized Equipment List (AEL)
    • Updated to reflect appropriate equipment
  • EHP MailboxGPDEHPinfo@dhs.gov
    • For EHP related questions
tips for a timely ehp review

EHP Compliance

Tips for a Timely EHP Review
  • A clear and descriptive project description, with clear color photos and maps
  • Submit materials as soon as you receive your award notice or in your planning phase
  • Include any previous Master Plans or other environmental documentation
  • What work is being proposed, where will it take place, and how will it be carried out?