Penn State Mars Society RASC-AL 2003 Integrated Astronaut Control System for EVA Problem Statement Future of space exploration: manned missions to Mars Exploration issues Long time delay from Earth EVAs far from home base These issues never previously encountered fully
E N D
Penn State Mars Society RASC-AL 2003 Integrated Astronaut Control System for EVA
Problem Statement • Future of space exploration: manned missions to Mars • Exploration issues • Long time delay from Earth • EVAs far from home base • These issues never previously encountered fully
Exploration Applications • Soil and rock samples • Surveying the Martian terrain • Scientific observation
Spacesuit • Bulkiness makes mobility difficult • Lack of flexibility • Gloves • Hand fatigue • Difficult to grasp objects • Solution: Rover accompanies astronaut
Rover Assisted Exploration • Rovers: tried and true Martian explorers • Useful toolkit for astronauts on EVAs • On-site rover control by astronauts • Variety of rover control systems • Joystick • Trackball • VR glove
Rover Control • Past: Control from Earth • Supercomputers • Delay due to transmission over large distance • Joystick control • Future: On-site control by astronaut • Joystick and trackball not practical • VR Glove
Design Requirements • Fine-tuned control • No overlap between commands • Efficient response to commands • Simplicity and ease of training • Transmission efficiency (range and power) • Multitasking
Virtual Reality Gloves • Simulates the environment for practical purposes • Flight training • Education • Capabilities • Six degrees of freedom • Many more states than conventional controllers • Feedback Data
Integration into the Spacesuit • Characteristics: • Mobility & Flexibility • Robust Function • Simple & Reliable • VR Glove is small • Lightweight • Thin fibers • Best Place to Install: • Max. sensitivity to hand motions • Between first and second layers
Our Solution • 5DT Data Glove • ActivMedia Pioneer 2-AT rover • SmileCam camera • Steering and camera control by VR glove
Gesture Control System • Data Input and Filtering • Gesture Recognition • State Selection • Device-Specific Output
Data Input and Filtering • Independent Input and Filter per hand • Raw glove data calibrated to user's range of motion • Exponential filter to smooth noisy data • Muscle Twinges • Cardiovascular pulses
Gesture Recognition • Hand sensor readings • 7.2e16 possible combinations! • Effect of finger dependencies with imprecise control: Not this many are realistic • Continuous Control: Mealy Model • Discrete Control: Moore Model • Hybrid Control
State Selection • Each hand operates independently • Certain states locked out to other hand • Root state allows external operation
Device-Specific Output • Translates gesture state into reasonable device output • Models exist for pan/tilt cameras, motion bases, and external microcontrollers
Player/Stage • Player: Robot device server • Abstracts device specifics from control class • Designed for networked operation from any language that supports TCP/IP • Stage: Simulator for Player controllers • Provides simulated environment for controller development • Utilizes same binary interface as Player
Rover Navigation • Uses Player's PositionDevice class • Translates glove finger position and roll into rotational and translational velocities
Target Selection • Translates glove gestures to control PanTilt device class • Manages selection of interesting targets
Testing Obstacle Course requires: 1. Figure Eight 2. Arcing Turn 3. Reverse 4. Slalom Three Input Devices: Glove Joystick Trackball
Course Results • User B has more training than User A • Joystick is the fastest method • Trackball is significantly slower
Results Analysis • Results analyzed in the context of remote operations • Joystick is faster, but the glove has other advantages
Future Developments • Touch Sensors • Force Feedback • More useful user feedback • Menuing • Sounds • Force Feedback • Autonomy in Tracking and Navigation