An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IPED COAL POWER CONFERENCE Construction Contracting The Rollercoaster presented by January 18-19, 2007 St. Petersburg, FL Keith J. Platte, P.E. R. W. Beck, Inc.

  2. Architect Engineer General Contractor Procure Major Equip Final Commiss. & Testing Substations & Elec. Inter. A/E Approach Owner

  3. ConstructionManager Sub-Contractor Sub-Contractor Sub-Contractor Sub-Contractor Engineer Procure Major Equip Substations & Elec. Inter. CM Owner

  4. Owner ConstructionTeam Sub-Contractor Sub-Contractor Sub-Contractor Sub-Contractor Engineer Construction Manager Procure Major Equip Substations & Elec. Inter. EPC CM Variation

  5. Construction ManagerOE Contractor Contractor Contractor Contractor Engineer Procure Major Equip Start Up & Commissioning Multiple Prime Owner

  6. EPC Contract (turnkey) Owner Substation EPC Contractor EPC Contractor Start Up & Testing Construction Procurement Engineer

  7. Contracting Time Line Gov’t Supports EPC as Contract Method of Choice 1990 1980 2006 1970 2000 Move to EPC Contracting A/E ApproachMega-projectsCost Reimbursable Move to Alternative ContractingCMMultiple Prime IPP’s CommenceEPC Contracts are Prevalent

  8. RISK $ Environment Holders Owner Construction Manager EPC Contractor Engineer Engineering Schedule Plant Performance QA QC

  9. What Type of Contracting Approach is Correct?

  10. Drivers • Owner internal capability • Bond market • Contractor financial condition • Major equipment supplier’s financial condition • Contractor bankruptcies • Labor market • Insurance market • Owner’s, engineering company’s and contractor’s risk tolerance • Regulatory environment

  11. EPC Contract Today P ? P ? ? P ? P ? • Design & Engineering • Procurement all Components • Construction • Schedule • Cost • Quality • Performance • Construction Permitting • Start Up & Commissioning

  12. Future • Mix of EPC contracting, multiple prime, and construction management • Pushback on various commercial terms • E.g. Limit of liability, fixed material cost, guaranteed schedule, lump sum cost, etc. • “Open book” concepts

  13. IPED COAL POWER CONFERENCE Questions Keith Platte, P.E. R. W. Beck, Inc. kplatte@rwbeck.com (303) 299-5264