1 / 25

Fermilab Proton Driver Project

Fermilab Proton Driver Project. Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany, Oct 18-22, 2004. Introduction.

Download Presentation

Fermilab Proton Driver Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany, Oct 18-22, 2004

  2. Introduction • Neutrino Superbeam/Proton Driver is one of 28 new facilities on the DOE’s 20-year strategic plan. • Fermilab Long Range Planning Committee has recommended the proton driver as one of two candidates for a future construction project at Fermilab. (LC is the other one.) • Early this year Fermilab director issued a charge to Bill Foster and Steve Geer to prepare a CD0 document for establishing mission needs for a proton driver. • There were two options considered: 8 GeV RCS or 8 GeV sc rf linac. • The ICFA decision to choose sc rf technology for a future ILC gave a big boost to the linac option. • Fermilab director recent announced to go for the linac option. • R&D for LC and proton driver will go in parallel. • The core part of this R&D is to establish a Superconducting rf Module Test Facility (SMTF) at Fermilab. This will be a multi-institution collaboration project. A LOI is being circulated. A number of instituion have signed up. ICFA-HB2004 Workshop, October 20, 2004

  3. Introduction (cont…) • The Proton Driver project is defined as: “a complete replacement of our current 400 MeV linac and 8 GeV Booster, accompanied by Main Injector upgrades.” • Beam power spec: • 8 GeV Proton Driver:  0.5 MW • 8–120 GeV upgraded Main Injector: 2 MW • Total beam power:  2.5 MW ICFA-HB2004 Workshop, October 20, 2004

  4. Proton Driver Study II(Fermilab-TM-2169) ICFA-HB2004 Workshop, October 20, 2004

  5. 8 GeV Linac Parameters Energy GeV 8 Particle Type H, e Hz 10 Rep. Rate m 671 Active Length mA 25 Beam Current ms 1 Pulse Length P / pulse 1.5E+14 Beam Intensity P/hour 5.4E+18 Linac Beam Power MW avg. 2 MW peak 200 ICFA-HB2004 Workshop, October 20, 2004

  6. Neutrino “Super- Beams” SY-120 Fixed-Target Damping Rings for TESLA @ FNAL With 8 GeV e+ Preacc. NUMI Off- Axis X-RAY FEL LAB 8 GeV neutrino 8 GeV Linac ~ 700m Active Length 1% LC Systems Test Main Injector @2 MW Bunching Ring Target and Muon Cooling Channel Recirculating Linac for Neutrino Factory Long-Pulse Spallation Source & Neutrino Target Short Baseline Detector Array VLHC at Fermilab Neutrinos to “Homestake” Wide Range of Applications Anti- Proton ICFA-HB2004 Workshop, October 20, 2004

  7. Wide Range Choice of MI Beam Energy ICFA-HB2004 Workshop, October 20, 2004

  8. Wide Range Choice of MI Beam Energy (cont…) ICFA-HB2004 Workshop, October 20, 2004

  9. 8 GeV Linac Baseline 2 MW ICFA-HB2004 Workshop, October 20, 2004

  10. 0.5 MW with TESLA Frequencies & SCRF F.E. ICFA-HB2004 Workshop, October 20, 2004

  11. RF Fanout ICFA-HB2004 Workshop, October 20, 2004

  12. RF Fanout at Each Cavity ICFA-HB2004 Workshop, October 20, 2004

  13. ELECTRONICALLY ADJUSTABLEE-H TUNER Attractive Price Quote from AFT (<< Klystron) FERRITE LOADED SHORTED STUBS CHANGE ELECTRICAL LENGTH DEPENDING ON DC MAGNETIC BIAS. TWO COILS PROVIDE INDEPENDENT PHASE AND AMPLITUDE CONTROL OF CAVITIES ICFA-HB2004 Workshop, October 20, 2004

  14. Ferrite Phase Shifter High-Power Test Stand A. Moretti, D. Wildman, N. Solyak, Y. Terechkine • 805 MHz Klystron • 12 MW x 100usec (need: 0.5 MW x 1 msec) First goal: See if existing YIG tuner functions at 500kW. (yes!) Ultimate Goal: 0.2 dB loss for 360 deg. phase shift in 100~500usec. Dry Load 12 MW Klystron YIG Ferrite Phase Shifter Door-knob Transition Hybrid Tee Ferrite Bias Supply ICFA-HB2004 Workshop, October 20, 2004

  15. Main Injector Upgrade to 2 MW Present Upgrade Injection kinetic energy (GeV) 8 8 Extraction kinetic energy (GeV) 120 8 - 120 Protons per MI cycle 3  1013 1.5  1014 Cycle time at 120 GeV (s) 1.867 1.533 Beam power (MW) 0.3 1.9 • Increase beam intensity by a factor of 5 • Reduce cycle time by 20% • Increase beam power by a factor of 6 ICFA-HB2004 Workshop, October 20, 2004

  16. Technical Systems Upgrade ICFA-HB2004 Workshop, October 20, 2004

  17. Dual PA for MI RF Cavity To be replaced by a 2nd PA ICFA-HB2004 Workshop, October 20, 2004

  18. New RF Design Z0 = 20 , R= 100 k, Q = 4000, R/Q = 25 , V = 240 kV ICFA-HB2004 Workshop, October 20, 2004

  19. Large Aperture Quadrupole Lamination design 3-D calculation Fabricating 9 magnets, 7 to be installed in the MI in 2005 ICFA-HB2004 Workshop, October 20, 2004

  20. Issues Concerning 8 GeV H Ions ICFA-HB2004 Workshop, October 20, 2004

  21. Blackbody Radiation Stripping 8 GeV 1 GeV • At 8 GeV, thermal photons emitted from the room temperature beam pipe would cause a loss of ~ 0.53 × 106 m1 sec1 • Or about 0.53 × 108 particles m1 sec1 • High radiation activation on the beam pipe is a serious concern ICFA-HB2004 Workshop, October 20, 2004

  22. Foil Stripping Efficiency  Measurements Webber & Hojvat, 1979 Fermilab linac, 200 MeV Gulley et al., 1996 LANL linac, 800 MeV H+ H+ H- H- H0 11.2% H0 H0 0.4% H0 ICFA-HB2004 Workshop, October 20, 2004

  23. Foil Stripping Efficiency  Calculation 0.5% H0 ICFA-HB2004 Workshop, October 20, 2004

  24. Summary • Proton driver and ILC are two candidates for a future construction project at Fermilab • The sc linac design is chosen. This has the major advantage of a large overlap in R&D for both candidates, e.g., SMTF • A key R&D item is the fast phase shifter • A comprehensive understanding of the transport and stripping of 8 GeV H ions is another high priority item • The lab has decided to work towards the goal of getting DOE’s CD0 approval next year. ICFA-HB2004 Workshop, October 20, 2004

  25. Questions?