1 / 18

EAST TOBA & MONTROSE HYDROELECTRIC PROJECT

EAST TOBA & MONTROSE HYDROELECTRIC PROJECT. Toba Site. Montrose Powerhouse. East Toba Powerhouse. Transmission Line. Toba Inlet. Project Overview. Toba Site. Project Overview. 3.

xanto
Download Presentation

EAST TOBA & MONTROSE HYDROELECTRIC PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EAST TOBA & MONTROSE HYDROELECTRIC PROJECT

  2. Toba Site Montrose Powerhouse East Toba Powerhouse Transmission Line Toba Inlet Project Overview

  3. Toba Site Project Overview 3

  4. Installed capacity of the two projects will be 196 MW with expected average energy generation of 745 GW.h/yr. • These projects will have the potential to produce enough electricity for • 75,000 homes • will potentially displace an estimated 455,000 tonnes of greenhouse gases annually. • This is the equivalent of • taking 80,000 cars off the road per year or • planting 60,000 hectares of trees. Environment 4

  5. Environmental Involvement/Challenges: • High priority for key stakeholders (Owner, Agencies, First Nations, Local Communities) • Operational Challenges • Camp Waste, Batch Plant Operations, Fuel / Oil Storage • Species at Risk • goats, grizzly bears, Northern Goshawks, Marbeled Murrelets, Fish and amphibians Environment

  6. Schedule

  7. Access Roads Total access road length: 65.0 km Access road completion to date: 62.0 km Bridge completions: 52 of 58 Construction Overview 7

  8. East Toba Powerhouse Excavation volume: 62,500 m3 Concrete volume: 7,900 m3 Excavation to date: 38,995 m3 Construction Overview

  9. East Toba Penstock • Penstock length: 5,376 m • Estimated cut: 354,000 m3 • Estimated fill: 114,000 m3 • Weholite pipe section: 650 m, 3,048 mm ID • Total sections: 49 pieces • Steel pipe section: 4,726 m • Outer diameter: 2,540 mm – 3,048 mm • Thickness: 9.7mm – 36.6mm • Total sections: 299 pieces • To date excavation: 66,500 m3 Weholite Pipe Section Construction Overview Steel Pipe Section

  10. East Toba Intake • Rubber dam design • Intake structure: • Structural excavation: 21,000 m3 • Structural backfill: 24,000 m3 • Concrete volume: 2,080 m3 • Diversion channel: • Excavation: 30,000 m3 • Fill: 17,000 m3 • Rip rap: 14,000 m3 • Liner: 15,000 m2 3 m high Rubber Dam Intake Project Overview Diversion Channel Earthworks

  11. Montrose Powerhouse Excavation volume: 45,000 m3 Concrete: 5,800 m3 Excavation to date: 31,300 m3 Project Overview

  12. Montrose Penstock • Penstock length: 4,232 m • Estimated cut: 342,000 m3 • Estimated fill: 109,000 m3 • Exposed penstock: 250 m • Slope: 120 % • Steel pipe section: 4,232 m • Outer diameter: 2133 mm – 2743 mm • Wall thickness: 8.6 mm – 24.9 mm • Total welds: 3,900 kg • Total sections: 247 pieces • To date excavation: 100,000 m3 Typical Exposed Penstock and Support Project Overview Typical Exposed Penstock and Support

  13. Montrose Intake Coanda Screen Design Structural excavation: 10,500 m3 Structural backfill: 10,300 m3 Concrete Volume: 2,680 m3 Project Overview Geotechnical surveyors at Intake

  14. Mechanical Components • 1 Bifurcation pipe per powerhouse • 2 Turbine inlet valves (TIV) per powerhouse • 2 6 nozzle scroll cases per power house • 2 vertical pelton turbines per powerhouse • East Toba: • 78.54 MW max. rated capacity (each unit) • Head: 575.0 m • Montrose: • 47.13 MW max. rated capacity (each unit) • Head: 459.4 m Bifurcation Pipe Construction Overview Installation of Mechanical Components TIV’s and Scroll Cases

  15. Transmission Line Total length: 156.8 km Total structures: 760 ea. Excavation to date: 309 ea. Poles installed: 185 ea. Conductors installed: 4 km Project Overview

  16. Transmission Line :Types of structures Project Overview Metal Structure Wooden Structures 16 Anchors

  17. Major Equipment • Excavators: • Cat 385 1 ea • Cat 365 2 ea • Cat 345 4 ea • JD 450 4 ea • Cat 330 3 ea • Dozers: • D9 2 ea • D8 2 ea • D6 1 ea • Rock Trucks: • Volvo A40 7 ea • Cat 740 3 ea Equipment 17

  18. Major Equipment • Drills: • Tamrock 800 4 ea • Hoe Drill 3 ea • Loaders: • Cat 988 1 ea • Cat 980 2 ea • Cat 966 1 ea • Cat 950 2 ea • Crusher/Batch Plants • Portable 1 ea • Track Jaw 1 ea • Batch Plants 2 ea Equipment 18