1 / 19

Combination of the Analysis Centers Reprocessed “SINEX” Solutions

Combination of the Analysis Centers Reprocessed “SINEX” Solutions. R émi Ferland Geodetic Survey Division. Contents. Introduction Procedure Network Products Coordinates ERP’s Apparent Geocenter Summary. Introduction. Main Objective:

Download Presentation

Combination of the Analysis Centers Reprocessed “SINEX” Solutions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IGS08, Miami, June 2-6, 2008 Combination of the Analysis Centers Reprocessed “SINEX” Solutions Rémi Ferland Geodetic Survey Division

  2. IGS08, Miami, June 2-6, 2008 Contents • Introduction • Procedure • Network • Products • Coordinates • ERP’s • Apparent Geocenter • Summary

  3. IGS08, Miami, June 2-6, 2008 Introduction • Main Objective: • Better meet users requirements by providing more consistent products. • Current Contributors (6 ACs / 5 included): • es1 European Space Operations Center, ESA, Germany • gf1 GeoForschungsZentrum, Germany • mi1 Massachusetts Institute of Technology, USA • ng1 National Oceanic and Atmospheric Administration / NGS, USA • pd1 GFZ Potsdam/IPG Dresden, Germany • si1 (not included) Scripps Institution of Oceanography, USA,

  4. IGS08, Miami, June 2-6, 2008 Procedure • Used results of the test period (1042-1060) • Updated as needed • Backward ( 2007 - 1994 ) • Cumulative solution initialized: • Use Modified Wk 1460: • Deweighted (x100) • Removed marginal stations • At the beginning Not “Steady State” • Rejection Criterion at 8 sigmas

  5. IGS08, Miami, June 2-6, 2008 425 Stations Used at least Once Combined Solution (2007)

  6. IGS08, Miami, June 2-6, 2008 ACs Network Usage Overlap

  7. IGS08, Miami, June 2-6, 2008 Weekly Number of Stations Processed

  8. IGS08, Miami, June 2-6, 2008 Weekly Number of Reference Frame Stations Processed

  9. IGS08, Miami, June 2-6, 2008 ACs Coordinates Residuals Avg. & Std. w.r.t. IGS05 N Consistency: N&E ~2-3mm H ~ 8mm Std. (mm) Avg. (mm) E H Scale=3x

  10. IGS08, Miami, June 2-6, 2008 ACs Coordinates Residuals Avg. & Std. w.r.t. IGS Weekly N Consistency: N&E ~1-2mm H ~ 3mm Std. (mm) Avg. (mm) E H

  11. IGS08, Miami, June 2-6, 2008 ACs Coordinates ResidualsAvg. & Std. w.r.t. IGS Cumulative Reprocessing N Consistency: N&E ~ 2mm H ~ 5mm Std. (mm) Avg. (mm) E H Scale=2x

  12. IGS08, Miami, June 2-6, 2008 ACs Scale offset

  13. IGS08, Miami, June 2-6, 2008 Combined ApparentGeocenter Position X(mm) Y(mm) Z(mm)

  14. IGS08, Miami, June 2-6, 2008 ACs Apparent Geocenter Residuals and Standard Deviation X Consistency: X&Y ~ 3-4mm H ~ 7mm Std. (mm) Res. (mm) Y Z Excluded: gf1 Scale=2x

  15. IGS08, Miami, June 2-6, 2008 ACs ERPs Average Weekly Residuals w.r.t. the IGS combined Yp Xp LOD Ypr Xpr Consistency: LOD ~ 10us [XY]p ~ 0.02-0.03mas [XY]pr ~ 0.08-0.10mas/d Excluded: pd1 LOD [XY]p, [XY]pr (Under Review)

  16. IGS08, Miami, June 2-6, 2008 Difference BetweenIGS ERPs and Bulletin A Xp Yp LOD Xpr Ypr Bull. A Pole Position Interpolated to mid-day Bull. A Pole Rate estimated from pole position

  17. IGS08, Miami, June 2-6, 2008 Summary (1/3) • 5 ACs • Network: • All stations : Weekly ~275; Total ~425 • Reference Frame Stations: 105 – 115 • Some AC Parameters Excluded • ERPs : pd1 • Geocenter : gf1

  18. IGS08, Miami, June 2-6, 2008 Summary (2/3) • ACs Coordinates Consistency w.r.t.: • IGS05 (N-E ~ 2-3 mm, H ~ 8 mm) • IGS Weekly (N-E ~ 1-2 mm, H ~ 3 mm) • IGS Cumulative (N-E ~ 2 mm, H ~ 5 mm) • ACs ERPs Consistency: • LOD ~ 10us • ( [XY]p ~ 0.02-0.03 mas; [XY]pr ~ 0.08-0.10mas/d) • Bull. A & IGS ERPs: • LOD -2 ± 18us • ( Xp&Yp -4&4 ±6 mas; Xpr&Ypr -5&-1 ± 15mas/d) • ACs Geocenter Consistency: • X & Y ~3-4 mm Z ~ 7mm

  19. IGS08, Miami, June 2-6, 2008 Summary (3/3) • Work in progress – some ACs are still missing • ~ One month to recombine one year

More Related