An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NSTX TF Flag Joint Design ReviewFabrication and Assembly April 10, 2003 By: James H. Chrzanowski NSTX TF Flag Joint Design Review

  2. Contents of Presentation • Identify the components of the Hub Assembly • Discuss improvements to TF bundle • Discuss new TF flag assembly • Discuss differences between the upper and lower hub assemblies • Discuss fabrication issues • Discuss the assembly details and sequence NSTX TF Flag Joint Design Review

  3. TF Flag Assembly Identification Upper Inner TF Flags Upper Hub structure Upper Outer TF Flags Lower Outer TF Flags Lower Hub structure TF Flag Support Box Torque restraint collar Lower Inner TF Flags Upper TF Hub Assy. Lower TF Hub Assy. NSTX TF Flag Joint Design Review

  4. New TF Bundle/ Hub Assembly • The new TF bundle will be fabricated in-house • This decision is based upon quality and schedule issues • PPPL has also retained possession of the original molds used in the TF bundle fabrication • There were several Quality concerns associated with the original TF bundle construction by the outside vendor. • These quality concerns resulted in: • coolant leaks • Additional rework of electrical faces in-house • In-house fabrication will result in closer supervision and better quality control NSTX TF Flag Joint Design Review

  5. New TF Bundle Fabrication • Once leaks were found on the TF bundle, new conductor was procured in FY-01 for possible future replacement of the TF bundle (CDA10700 OFHC silver bearing copper) • An epoxy cure oven is presently being designed and fabricated for this purpose (ready by end of May) NSTX TF Flag Joint Design Review

  6. TF Bundle Epoxy Cure Oven • Oven will be used for curing the B-stage T/T and groundwall insulation on the TF bundle • Will be used for soldering the coolant tubes into the conductors • Sized to accommodate the OH solenoid molds for possible future upgrades • Modular design oven for easy disassembly & storage NSTX TF Flag Joint Design Review

  7. Quality Problems with Original TF Bundle Numerous coolant tube leaks developed once operations began NSTX TF Flag Joint Design Review

  8. Improvements to TF Bundle • Design Improvements: • Coolant Tubes • Improve integrity of coolant tube design • Routing- Upper tubes to come straight out the top • Type of tubing- straight length seamless Cu • Joint Improvements • Replace joint Inserts- Tap-lok Inserts • Improve shimming- Flag box • New fastener design NSTX TF Flag Joint Design Review

  9. Upper Hub Assembly • The new upper hub assembly has (2) different flag designs • Inner Flag- Bolted joint • Outer Flag- E-beam welded flag NSTX TF Flag Joint Design Review

  10. E-Beam Welding of Upper Outer Flags Weld flags to upper outer conductors following initial machining, but prior to final machining and bundle assembly • Bolt on electrical end flags following epoxy fill of flag boxes NSTX TF Flag Joint Design Review

  11. TF Flag Structural Boxes Gaskets for sealing box Blind tapped holes Kapton insulation along entire length of flag Epoxy fill holes Dry glass insulation along length of interface fills space between flag and box Stainless steel boxes 0.010 in. allowance for fitup of flag to conductor NSTX TF Flag Joint Design Review

  12. Typical TF Flag Joint-(Upper inner; lower inner & outer) Stainless steel washer plate, belleville washers and nuts Tap-lok inserts A-286 fasteners Flag resistance lead Flag box (stainless steel) Shear Pin & Block (stainless steel) * Fasteners will be discussed in detail by Mike Kalish NSTX TF Flag Joint Design Review

  13. 3 4 2 1 Upper TF Hub Assembly-1 • Preposition lower hub plate [1] • Insulate flags (Kapton & glass) [2] • Position flag boxes over flags [3] • Attach front contact face [4] • Note: front contact faces may be attached either prior to or after epoxy fill of boxes) Lower hub plate NSTX TF Flag Joint Design Review

  14. 2 3 1 Upper TF Hub Assembly-2 • Complete assembly of Flag boxes [1] • Install center hub structure into position [2] • Fasten upper and lower plates to the flag boxes [3] Center hub structure NSTX TF Flag Joint Design Review

  15. 2 2 1 Upper TF Hub Assembly-3 Upper hub plate • Install shear blocks and pins [1] • Install leads for flag resistance measurements • Install studs and pre-assembled boxed inner flags into position [2] • Jack flags to contact shear blocks • Install upper hub plate • Secure the mid and upper plates to the flag boxes [3] NSTX TF Flag Joint Design Review

  16. 2 1 Upper TF Hub Assembly-4 • Jack flags to contact shear blocks • Vacuum fill the individual flag boxes with Hysol epoxy [1] • Install the torque restraint support ring to the TF bundle via epoxy/ glass lay up [2] NSTX TF Flag Joint Design Review

  17. Installation of Torque Restraint Support Ring • Install torque restraint collar Buildup of dry glass and Hysol epoxy (wet lay-up) over ground wall NSTX TF Flag Joint Design Review

  18. Pre-Assemble the Lower Hub Assembly • Pre-assemble lower hub structure prior to TF installation • Epoxy fill the flag boxes • Do not install lower torque restraint collar • Disassemble lower hub structure NSTX TF Flag Joint Design Review

  19. Installation of TF Bundle NSTX TF Flag Joint Design Review

  20. Final Assembly of Lower Hub Assembly • Complete assembly of the lower hub structure including torque restraint collar • Install pedestal and complete bus and umbrella component assembly NSTX TF Flag Joint Design Review