Inspection Program Improvements

Inspection Program Improvements. Peter Katchmar OPS Western Region May 17, 2005. Inspection Protocol Updates. Protocols re-examined for content and organization as part of inspection continuous improvement Changes focused on optimizing inspection efficiency and eliminating redundancy

vickyg
Download Presentation

Inspection Program Improvements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inspection Program Improvements Peter Katchmar OPS Western Region May 17, 2005

  2. Inspection Protocol Updates • Protocols re-examined for content and organization as part of inspection continuous improvement • Changes focused on optimizing inspection efficiency and eliminating redundancy • Updated protocols posted on IIM (http://primis.phmsa.dot.gov/iim/index.htm) • Cross-reference document posted on IIM

  3. Protocol Update Highlights • Process formality and revision control areas consolidated into new protocols 8.05 and 8.06 • Most protocol areas reduced in number of questions • For example, Segment Identification (Protocol area 1) now has eight questions vs. previous twelve

  4. Protocol Update Highlights • No changes to Remedial Action area (Protocol area 4) • Transferred “Installed Leak Detection System Information” protocol (6.05) to Operator Performance Data information sheet

  5. Protocol Update Highlights • Periodic Evaluations split out from “Periodic Evaluation and Assessment Intervals” (Protocol 7.01) • Reflects importance of 195.452(j)(2) as IMPs progress past baseline assessments • Rule requires frequency of periodic evaluations based on risk factors specific to the pipeline

  6. Protocol Update Highlights • 195.452(j)(2) contains a specific set of minimum information that periodic evaluations must consider • Assessment results (baseline and periodic) • Information/risk analysis • Remediation decisions • Preventive and mitigative actions decisions

  7. Areas of Emphasis in Future Inspections • Previously identified “opportunities for improvement” from past inspections • “Most Common” areas of identified issues • Previously discussed for each area • Overall “most common” list of issues

  8. Overall Most Common Issues Areas • Developing and implementing a systematic, documented process to evaluate additional preventive and mitigative measures to protect HCAs • Consideration of facilities (e.g., tanks) in risk analysis

  9. Overall Most Common Issues Areas • Development of a process to adequately train personnel responsible for reviewing assessment results • Integration of other pertinent data in a timely manner when evaluating assessment results

  10. Overall Most Common Issues Areas • Use of local knowledge, field personnel input, and other sources to update HCA information • Development of a comprehensive risk analysis process that considers all required risk factors • Inclusion of adequate detail in all areas of the integrity management plan

  11. Overall Most Common Issues Areas • Technical justification for pre-70 LF ERW or lap-welded pipe not being susceptible to seam integrity issues • Development of a documented EFRD needs analysis

  12. Overall Most Common Issues Areas • Documentation of the reasons for changes to the Baseline Assessment Plan • Development of ILI vendor specifications, including tool tolerance requirements and timeframes for completion of ILI reports

  13. Field Verification Inspections • Regions interested in verifying IM-related field activities. Examples: • HCA areas of interest • ILI actions • Repair and remediation activities • Installation or implementation of preventive and mitigative measures • Region-specific criteria for activities selected

  14. The End