8 ric
This presentation is the property of its rightful owner.
Sponsored Links
1 / 15

Richfield Soil Survey Office PowerPoint PPT Presentation


  • 49 Views
  • Uploaded on
  • Presentation posted in: General

8-RIC. Richfield Soil Survey Office. Extent of Area. Precipitation. Average Annual Precipitation ranges from 6 to 30 inches. Most areas are on the dry side of the range in the typic aridic and ustic aridic soil moisture regimes. Temperature. Soil Temperature Regimes.

Download Presentation

Richfield Soil Survey Office

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


8 ric

8-RIC

Richfield Soil Survey Office


Extent of area

Extent of Area


Precipitation

Precipitation

Average Annual Precipitation ranges from 6 to 30 inches. Most areas are on the dry side of the range in the typicaridic and usticaridic soil moisture regimes.


Temperature

Temperature


Soil temperature regimes

Soil Temperature Regimes


Current projects

Hovenweep National Monument – Update

Capitol Reef National Park Soil Survey

Kane County Soil Survey

Zion National Park Soil Survey

Current Projects


Current projects1

Current Projects


Hovenweep national monument

  • Soil Survey Manuscript

    • Completed English Edit

      Ecological Site Description Report

    • Currently at English Edit

Hovenweep National Monument


Capitol reef national park

Capitol Reef National Park

  • Spatial and Attribute data are posted to WSS

  • Digital Map Finished Product is complete

  • Draft Manuscript has been circulated

  • ESDs are in draft form awaiting approval

  • ESD report is in draft form


Zion national park

Held Scoping Meeting in April

Research Permit Obtained

Reconnaissance of riparian areas started in August

Premapping started

Zion National Park


Zion national park1

  • Mapping Considerations

    • More detailed mapping in high use areas

    • Detailed mapping on private inholdings

    • Note springs and related soils

    • 1 mm (#100) sieve data needed for hydrologic modeling

      • Surface and first underlying horizon

      • Prefer to store in NASIS

Zion National Park


Kane county soil survey

  • FY 14

    • Complete QC report

    • Submit draft series

    • Complete manuscript

    • QC Spatial data

    • Submit for Correlation

Kane County Soil Survey


Sdjr projects

  • Submitted for approval

    • Mellenthin very gravelly loam, 1 to 25 percent slopes

    • Klondike sandy clay loam, 2 to 15 percent slopes

  • Other potential projects

    • Gypsiorthids-Gypsiorthids, shallow complex, 1 to 50 percent slopes

    • Showlow very cobbly clay loam, 1 to 15 percent slopes

SDJR Projects


Sdjr projects1

SDJR Projects


Other projects

  • Henry Mountains Cooperative ESD Project

    • Data is being evaluated

  • Shale/Saltbush ESD Re-evaluation

  • Tarantula Mesa Soil Climate Re-evaluation

    • Will be proposed

  • Washington City Hydrologic Group Project

    • TSS project

Other Projects


  • Login