LHCb FEE LNF status

LHCb FEE LNF status. Overview. Muon Meeting - LNF 12/13 Feb 04. OPB SPB IB ODE Crate backplane FEE LV System Layout FC FEE LV On-Chamber Layout. OPB. Muon Meeting - LNF 12/13 Feb 04. PCB Layout  OK Prototypes  OK SCRO production Red type (long pins)  2000

trula
Download Presentation

LHCb FEE LNF status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb FEE LNF status

  2. Overview Muon Meeting - LNF 12/13 Feb 04 • OPB • SPB • IB • ODE • Crate backplane • FEE LV System Layout • FC • FEE LV On-Chamber Layout

  3. OPB Muon Meeting - LNF 12/13 Feb 04 • PCBLayout  OK • Prototypes  OK • SCRO production • Red type (long pins)  2000 • Yellow type (short pins)  1300 • Components delivery  April 04 • Assembling & test  June 04 • DCRO • Blue  150 • PCB delivery  March (1° week)

  4. OPB Muon Meeting - LNF 12/13 Feb 04 • SCRO PCB  0,53 € • DCRO PCB  3,20 € • Connectors (long-single row-19 contacts)  0,50 € • Cod. 801-91-019-10-005 • Connectors (short-single row-19 contacts)  0,33 € • Cod. 801-91-019-10-12 • Assembling & test  0,50 €

  5. Muon Meeting - LNF 12/13 Feb 04 SPB • PCBLayout  OK • Potenza (Donato) is in charge for SPB production

  6. Muon Meeting - LNF 12/13 Feb 04 IB & TB • IB PCBLayout  OK • TB PCB Layout  OK • TB rel. 2 (increased number of outputs) • Test  March 04 • Production (connectors delivery time)  June 04 • IB rel. 2 (ACTEL configuration) • Test  February 04 • IB Components Qualification  Summer 04 • IB Production (start)  December 04

  7. Muon Meeting - LNF 12/13 Feb 04 ODE • PCBLayout rel. 2  February • QPLL • HFBR772BP • ACTEL PROASIC • TTCRX Optical Receiver • PCB delivery  March • Assembling  April • Test  May

  8. Muon Meeting - LNF 12/13 Feb 04 Crate backplane • PCBLayout rel. 2  March • TTCRX new optical receiver requires +5 V • PCB delivery  April • Assembling  May • Test  June

  9. Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – Current requirements 430 ma

  10. Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – 3 A modularity scenario

  11. Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – CAEN solution System Layout Available modules

  12. Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – WIENER solution System Layout Available modules

  13. Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – Modules & Crates - CAEN

  14. Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – Modules & Crates - WIENER

  15. Muon Meeting - LNF 12/13 Feb 04 FC • FC design • HV connector not defined • Wait for FEB to produce FC proto ?

  16. Muon Meeting - LNF 12/13 Feb 04 FEE LV on-chamber layout – M3R3