TKR Flex Cable Issues addressed

TKR Flex Cable Issues addressed . Mechanical Grid – Flex Cable Interface CTE mismatch Tower – Grid (introduce loop) Cable – Wall interference: move resistors Cactus arm resistors on wall side, all other on TEM side Cable – TEM interface (take out loop)

thisbe
Download Presentation

TKR Flex Cable Issues addressed

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TKR Flex Cable Issues addressed Mechanical • Grid – Flex Cable Interface • CTE mismatch Tower – Grid (introduce loop) • Cable – Wall interference: move resistors • Cactus arm resistors on wall side, all other on TEM side • Cable – TEM interface (take out loop) • Stiffener at D connectors (TEM side) see below • Assembly Procedure (NO pre-bend, but needs more meat) • Bend Tool for Cactus arms (existence proof only) Electrical • Doubling Vias • Via Stay-clear in Bend Area • Resistors to Improve GTRC margins (out) • Resistors to Improve Polyswitch Functioning (in)

  2. Docs for C0 Proto Flight Order LAT-DS-02049-05 Flex-circuit Cable Schematic Diagram LAT-DS-00584-08 Flex-circuit C-0 Mechanical Layout LAT-DS-02377-02 Tracker Tower Flex-circuit Cable C-0 Assembly LAT-DS-00334-03 Gerber Files for Flex-circuit C-0 LAT-DS-03031-01 TKR Flex cable Stiffener LAT-TD-xxxx Assembly Process for Proto-flight Tracker Flex Cable Nano Connectors Numbers to order 11 assembled, 3 bare: Assembled (8 + 1 spare) = 9 INFN for Tower Testing 2 DAQ Bare (delivery when fab’d) : 3 SLAC

  3. To be Done Coordination: Jerry Clinton, Parts: Jeff Tice Mechanical Layout: Tim O’Heron, Electrical Layout: Dave Nelson • C0: • draw LAT doc number for Stiffener Gerber file, change dimensions in mech. Drawings • Make corrections in assembly drawing • Update “Assembly Process” with resistors, and RPJ comments • C1 – C7 Layout: Same Interface with Grid • Problem Area: C4-C5 Stay Clear on Top • Start PO for Flight Order now • Specs and SOW are signed – off, have ROM • Order Parts from “Flex_cables_2_17”:

  4. Material Manufacture Function Supplier Item 1 FM-73M Cytec Engineered Materials Film Adhesive for nano connector to Flex Cable Vendor or SLAC Item 2 EA-9394 Hysol Epoxy for potting of nano connector to Flex Cable Vendor or SLAC Item 3 A8486 Omnetics 37 pin female nano connector SLAC Item 4 100 Ohm State of the Art Resistor for flex cable SLAC Item 5 200 Ohm State of the Art Resistor for flex cable SLAC Assembly Process Doc Responsible: Jerry Clinton, Parts: Jeff Tice RPJ Message: should the drawing not specify the thermistor to be glued down and then potted? In flight cables we will also need to specify potting for the connectors and resistors (or maybe just a conformal coat for the latter). Should there not be a note on the drawing regarding the cure cycle for the film adhesive (done)? I would like to make it clear somehow that the film adhesive needs to extend under the metal wings of the connector, not just the main plastic body. This was not done so far at SLAC, but it is important if we are to be sure that the metal shells don't pop off. hartmut: Update with other parts: 39kW, thermistor, stiffener(?),

  5. Way to TKR Flex Cable : Milestones • 06/23/2003 Start of my clock • 08/26/2003 PRR Readiness Review • 10/27/2003 TKR Interface Design Report • 11/28/2003 Original target for TKR IDD • 01/23/2004 New Layout Crew on board • 02/10/2004 Finalize interface GRID-TKR Flex cable C0 • 02/13/2004 Finalize electrical layout cable C0 “You are here” • 02/17/2004 Is TKR IDD signed-off? • 02/17/2004 PO Start Production of 14 non-flight C0 cables for INFN/DAQ • 03/01/2004 ? All cables designed and laid out, ready for PRR • 03/12/2004 Tim O’Heron leaves • 03/15/2004 ? Start Production of Short Cables • ????? PRR,PO! Start Production of Flight Cables • 03/15/2004 ? Flight connectors / Parts available ? • 04/15/2004 TKR Tower Test cables needed (C0)