30 DAYS. 30 DAYS. START. FINISH. ENCLOSURE (14) Page T-1 VERSION 3.0 February 2004. PEO C4I and SPACE ACQUISITION PROGRAM STRUCTURE GUIDE. PEO C4I and SPACE DESIGN READINESS REVIEW (DRR) TIMELINE. TIMELINE ~ Event Driven BETWEEN MILESTONE B and DRR. LONG-RANGE (PLANNING PHASE).

Download Presentation

System Integration Exit Criteria Issues Resolved or Addressed

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


System integration exit criteria issues resolved or addressed

30 DAYS

30 DAYS

START

FINISH

ENCLOSURE (14)

Page T-1

VERSION 3.0

February 2004

PEO C4I and SPACE ACQUISITION PROGRAM STRUCTURE GUIDE

PEO C4I and SPACE

DESIGN READINESS REVIEW (DRR) TIMELINE

TIMELINE

~ Event Driven

BETWEEN MILESTONE B and DRR

LONG-RANGE

(PLANNING PHASE)

6 MONTHS

(PLANNING PHASE)

BEGINNING OF DRR

PLANNING PHASE

REVIEW DRR CHECKLIST & PEO

MAJOR REVIEW CHECKLIST

180 DAYS

CONDUCT ACT MEETING–

Obtain consensus to proceed.

(Email minutes to ACT Participants)

90-180 DAYS

90-180 DAYS

DRAFT ACT CHARTER

REFINE AoA PLAN, AS, CDD,

ICD, TDS, AND TEMP

90-180 DAYS

PREPARE EXIT CRITERIA FOR SYSTEM INTEGRATION AND ANY ANTICIPATED ISSUES WITH RESPECT TO SYSTEMS ACQUISITION ACTIVITIES

90 DAYS

90 DAYS

DRAFT BRIEF AND ADM

BEGINNING OF PHASE B

CONFIRM AVAILABILITY OF PRINCIPLES

For proposed briefing date

30 DAYS

ENSURE THE PDR AND CDR

HAVE BEEN COMPLETED

SYSTEM INTEGRATION

This effort, which is the first effort of the SDD phase, is intended to integrate subsystems, complete detailed design, and reduce

system-level risk.

BEGINNING OF SYSTEM DEMONSTRATION

SCHEDULE PRE-BRIEF AND BRIEF

VIA ACQUISITION WEBSITE AND PEO

FRONT OFFICE CALENDAR

30 DAYS

(PRE-REVIEW PHASE)

REVIEW DRR

PRE-REVIEW CHECKLIST

30 DAYS

ENSURE SYSTEMS ACQUISITION ACTIVITIES HAVE BEEN INITIATED

30 DAYS

20 DAYS

SEND PRE-BRIEF TO ACT MEMBERS FOR REVIEW

~1 DAY

(REVIEW PHASE)

CONDUCT THE DRR PRE-BRIEF(Closed Sessions)

7 DAYS

5 DAYS

SEND FINAL BRIEF AND ADM TO ACT FOR REVIEW

ENTRY CRITERIA FOR

SYSTEMS INTEGRATION

SATISFIED

EXIT CRITERIA FOR

SYSTEM INTEGRATION

SATISFIED

PHASES

MS B

DRR

LONG RANGE

PLANNING PHASE

PRE-REVIEW

PHASE

At DRR, the MDAtypically emphasizes validationof the following:

PLANNING PHASE

ADM

  • CAPABILITIES DEVELOPMENT DOCUMENT

  • ACQUISITION STRATEGY

  • APB

  • SYSTEM INTEGRATION EXIT CRITERIA

  • TEST PLANS (Especially for DT&E and IOT & E)

  • CCA Requirements

  • ADEQUACY OF RESOURCES (Manpower and Funding)

  • ICE AND MANPOWER ESTIMATE (10USC2434)

  • UPDATED C4ISR SUPPORT REQUIREMENTS

  • ISP UPDATE

  • TEMP

  • TECHNOLOGY READINESS ASSESSMENT

  • SEE DoDI 5000.2 ENCLOSURE (3) for additional requirements

-ENTRY/EXIT CRITERIA FOR DRR HAVE BEEN MET

- APPROVAL FOR SYSTEM

DEMONSTRATON EFFORTS

- EXIT CRITERIA FOR NEXT PHASE ESTABLISHED

SEE DESIGN

READINESS

REVIEW

LONG-RANGE PLANNING

CHECKLIST

SEE DESIGN

READINESS

REVIEW

PLANNING

CHECKLIST

SEE DESIGN

READINESS

REVIEW

PRE-REVIEW

CHECKLIST

SEE DESIGN

READINESS

REVIEW

CHECKLIST

PROCESS

System Integration

Completed

Preliminary Design Review/Critical Design Review, Audits

System Integration status

validated based on CDR results

System Integration

Exit Criteria Issues

Resolved or Addressed

Mature Design

for Testing

DT & E Plans

Complete & Provided

Draft ADM

(Ready for System Demo

/ DT & E initiation /

Entry/Exit Criteria Meant)

Initiate

Design Readiness Review

Planning Process

Documentation Updates

CDD, Acquisition Strategy,

TEMP, CARD, Threat, APB

Cost, Schedule

Performance Trade Off

Analysis

DRR

Decision

Brief

With PEO

DRR

Decision

Brief

With MDA

System Integration

Exit Criteria Satisfied

Coordinate with

SECDEF

Initiate

Acquisition Coordination

Team (ACT) Planning

Complete and Submit

Program Decision Brief

Conduct ACT

Meetings

Coordinate with

SECNAV

MDA Approve

Exit Criteria

ACAT

I and II

PEO Approve

Exit Criteria

ACAT

III and IV

Coordinate with

OPNAV

Begin Program Decision

Brief Updates

Notify Participants

Coordinate with

SYSCOM

Plan and schedule

JROC, OIPT, DAB

(if required)

Schedule DRR

Decision Meeting

NOTE: Design Readiness Review (DRR) is a discretionary review conducted after Milestone B and signifies the end of System Integration and the start of System Demonstration. Refer to DoDI 5000.2, Para 3.7.3 and SECNAVINST 5000.2C, Para 2.5.4.6.2 for Design Readiness Review requirements.