Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011

Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011. Summary of February 02, 2011 Event. At midnight, ERCOT had planned generation availability of 61,351 MW. EEA Level 2A issued when reserves dropped below 1,750 MW at 5:20 AM.

tavi
Download Presentation

Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy Emergency Alert (EEA) UPDATE FEBRUARY 8, 2011

  2. Summary of February 02, 2011 Event • At midnight, ERCOT had planned generation availability of 61,351 MW. • EEA Level 2A issued when reserves dropped below 1,750 MW at 5:20 AM. • 77 generators had tripped/did not come online prior to the 10 AM morning peak load. • EEA Level 3 issued at 5:43 AM for 1,000 MW firm load shed; total of 4,000 MW firm load shed by 6:23 AM. • Final Firm Load restoration ordered at 1:07 PM. • Load Resources recalled at 1:57 PM. • New winter peak record set in the evening, 56,334 MW (integrated hourly average). • EEA Level 2A ended & Emergency Interruptible Load Service (EILS) recalled on February 3 at 10 AM. 08 February 2011 ERCOT Public

  3. Average Daily Temperatures for January and February, 1996 thru Feb 2, 2011 count • Dallas deg F Feb 2011 Jan 2010 Austin • Houston • count count Jan 2010 and Feb 2011 deg F Feb 2011 Jan 2010 deg F

  4. Pre-Event Preparation Feb 1 prior to midnight: 13 Generating Resources were committed in the Reliability Unit Commitment process. Jan 28-31: Transmission outages – cancelled, withdrawn or delayed 10-345 kV lines 27-138 kV lines 3-69 kV lines 2-345/138 kV autotransformer 1-138/69 kV autotransformer Jan 31 at 6:30: Operating Condition Notice issued, “A cold front is approaching with temperatures anticipated to be in mid to low 18 degree range and maximum temperature expected to remain near or below freezing impacting 50% of more of major metropolitan areas. Estimated starting time Tuesday 2/1/11 09:00”. Jan 28 Feb 1 Feb 1 at 09:05: Advisory issued, expecting temperatures in teens to low 20F; maximum temperatures near or below freezing impacting 50% or more of major metro areas. Jan 31 at 4:25: Requested MCSES 8 to be on-line by 10:00 on Feb 1; this generator has a long start-up lead time. Jan 31 at 10:30: Requested LHSES 1 on-line burning oil. 08 February 2011

  5. Event Timeline – February 02, 2011 Issued EEA 3 Firm Load Shed 1,000 MW 5:44 EILS deployed New winter Peak Record 56,334 MW (Integrated ), 56,480 MW (Instantaneous). 13:07 Restored 500 MW Restoration Complete 7:57 Restored 500 MW (3,500 MW out) 8:22 Restored 500 MW (3,000 MW out) 9:25 Restored 500 MW (2,500 MW out) 4:30 1,804 MW Non-Spin deployed Move to EEA 2B From EEA 3 Feb 2 Feb 3, 10 AM EEA 2A ends & EILS recalled 5:43 14:01 19:15 5:08 5:20 6:04 Firm load shed 1,000 MW (2,000 MW total) 6:05 Frequency 59.576Hz 6:23 Firm Load Shed 2,000 MW (4,000 MW total) 6:59 Media Appeal issued 11:39 Restored 500 MW (2,000 MW out) 12:04 Restored 500 MW (1,500 MW out) 12:25 Restored 500 MW (1,000 MW out) 12:49 Restored 500 MW (500 MW out) 15:14 Issued EEA 2A Reserves below 1,750 MW Load Resources deployed Move to EEA 2A From EEA 2B 13:57 Load Resources Recalled Issued Watch Reserves below 2,500 MW 08 February 2011

  6. ERCOT Load Curtailment to manage Grid Security 08 February 2011

  7. Forced Generation Outages Note: Values represent cumulative forced outage capacity for each day. 08 February 2011 ERCOT Public

  8. Outaged Generation 08 February 2011 ERCOT Public

  9. Planned Generation Minus Outaged MW vs. Load Forecast at Midnight 08 February 2011