An Implementation of the Lurie-Goldberg Algorithm in Schedule Risk Analysis

  • 727 Views
  • Uploaded on
  • Presentation posted in: General

Introduction. Risk 2.0 is a schedule risk analysis add-in to Microsoft ProjectThe product implements the Lurie-Goldberg1 algorithms for generating correlated variables and for adjusting inconsistent correlation matricesDetails follow. 1An Approximate Method for Sampling Correlated Random Variab

I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.

Download Presentation

An Implementation of the Lurie-Goldberg Algorithm in Schedule Risk Analysis

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


  • Login