status of scintillator detector development for central part of the tof cbm
Download
Skip this Video
Download Presentation
Status of scintillator detector development for central part of the TOF CBM

Loading in 2 Seconds...

play fullscreen
1 / 2

Status of scintillator detector development for central part of the TOF CBM - PowerPoint PPT Presentation


  • 70 Views
  • Uploaded on

#2. #4. #5. #1. #3. PADI. Amp. Amp. Amp. Amp. Amp. Amp. Amp. PMT2. LeCroy ADC&TDC (CAMAC). Status of scintillator detector development for central part of the TOF CBM.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Status of scintillator detector development for central part of the TOF CBM' - rico


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
status of scintillator detector development for central part of the tof cbm

#2

#4

#5

#1

#3

PADI

Amp

Amp

Amp

Amp

Amp

Amp

Amp

PMT2

LeCroy ADC&TDC (CAMAC)

Status of scintillator detector development for central part of the TOF CBM

INR (Moscow) group proposed to use scintillator detector with MAPD readout as a cheap and reliable solution for central part of the CBM TOF wall with the cell size of 20x20 mm2

This conception was experimentally tested at GSI (FOPI) in April 2009

  • 3.5 GeV protons scattered at ~40 from FOPI target were used;
  • Start counter with two PMT readout has time resolution st~40 ps;
  • Six Scint (Kharkov)+MAPD-3N (Zecoteck) individual counters 20x20x20 mm3;
  • Amplifier with input impedance 4 Ohm, bandwidth 300 MHz and G~120 was used;
  • LeCroy TDC has scale 50 ps/ch.

PMT1

slide2

April beam test results & nearest plans

Time resolution

after slewing correction

MAPDs were no selected before test and have different PDE!

It was demonstrated that scintillator detector with MAPD-3N readout is promising for central TOF

MAPD-3N

(ZECOTECK)

Gain vs Vbias

PDE vs Vbias

  • Preselection of MAPDs with highest PDE;
  • Develop new faster preamp with lower noise;
  • Use of monoenergetic beam

November `09 beam test

at CERN

ad