An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRNO UNIVERSITY OF TECHNOLOGY Faculty of Civil Engineering Institute of Municipal Water Management BRNO, Czech Republic Short-term rehabilitation planning of water distribution networks Tomáš Kučera Ladislav Tuhovčák

  2. Water pipes in Czech Republic • 64.500 km water mains in the CR • about 800 km per year should be rehabilitated • questions • What approach to reconstruction is the most suitable? • What technology should be used?

  3. Rehabilitation Planning • terms • long (15-20 years) • middle (3-5 years) • short (annual)

  4. Annual Rehabilitation Planning • main goal • propose some pipes for rehabilitation • questions • where? • when? • how? • cost?

  5. Planning diagram

  6. Steps of annual rehab planning • Basic elements

  7. The basic elements • hydraulic sections • not favourable • often too short • entities • several hydraulic sections with the same parameters: • diameter • material • installation year • system of streets • pattern of development • map of valves

  8. Steps of annual rehab planning • Obtaining of basis data

  9. The basis data • town planning scheme • Water-supply topology, mathematic model • regulations for water supply operation • long and middle term rehab plan • operation documentation • failures • leakages • television inspection survey • analysis of water quality • co-ordinations

  10. Steps of annual rehab planning • Criteria

  11. The set of criteria by CARE-W1. Internal • Annual Repair Cost • Water Losses Index

  12. The set of criteria by CARE-W2. External • Water Interruptions • Predicted Water Interruption • Predicted Critical Water Interruption • Predicted Frequency of Water Interruption • Damage and disruptions • Damage due to Flooding in Housing area • Damage due to Flooding in Industrial or commercial areas • Damages due to Soil Movement • Traffic Disruption • Damages and/or Disruption on other Infrastructure • Water Quality Deficiencies • Hydraulic Deficiencies

  13. The set of criteria by CARE-W3. Other • Co-ordination • with other utilities and roadway rehabilitation programmes • with service connection replacement programmes

  14. The simple set of criteria

  15. Steps of annual rehab planning • Selecting of entities

  16. Multi-criteria assessment • selecting a set of some elements (pipe-sections, entities) for rehabilitation • sorting procedure • the method of average weighting • => sort list • ranking procedure • the Electre methods • => categories • CARE-W_ARP (INSA Lyon)

  17. Steps of annual rehab planning • Rehab technologies

  18. Database of the rehab technologies • the selection of the right rehab technology for the sorted elements • rehab technologies for water mains • open-trench • trenchless • evaluation of every technology by criteria

  19. Database of the rehab technologies • applicability • costs • influence on • environment • pipe material • water quality • hydraulic properties • supplemental information • maximum length of pipe-section • realisation time • armature removing

  20. Decision support for the Annual Planning • CARE-W_ARP

  21. Priorities of operator „BVK“Weight of criteria [%]

  22. Annual Rehab Plan for Sub-zone by CARE-W_ARP by BVK (operator)

  23. Decision support for the Annual Planning • NetPlan_A

  24. NetPlan_A • Knowledge basis • Data • Input • Criteria • Pipe materials • Rehab technologies

  25. NetPlan_A • Task • Data evaluating • Sector value • Criteria calculation • Entities assortment • Technology proposition

  26. Conclusions • main goal: • to create a comprehensive support for annual rehab planning, which will be applicable in the conditions of the Czech Republic

  27. Thank you for your attention Tomáš Kučera kucera.t@fce.vutbr.cz Brno University of Technology http://water.fce.vutbr.cz