Regional Planning for Green Infrastructure Retrofits

Regional Planning for Green Infrastructure Retrofits. Growing Green Infrastructure in NYS SUNY ESF Session 1: Planning – 11.17.10. Green Infrastructure and Low Impact Development Evaluation and Implementation Plan http://gflrpc.org/GreenInfrastructure.htm. Clean Water Act Section 604(b)

pkarr
Download Presentation

Regional Planning for Green Infrastructure Retrofits

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Planning for Green Infrastructure Retrofits Growing Green Infrastructure in NYS SUNY ESF Session 1: Planning – 11.17.10

  2. Green Infrastructure and Low Impact Development Evaluation and Implementation Plan http://gflrpc.org/GreenInfrastructure.htm Clean Water Act Section 604(b) Water Quality Management Planning Projects Appropriated from the American Recovery and Reinvestment Act (ARRA)

  3. Credits Brian C. Slack, AICP Senior Planner – Genesee/Finger Lakes Regional Planning Council John Lagorga, P.E., BCEE & Gregory Liberman, CPESC Stearns & Wheler, LLC Portions of this presentation have been adapted from: • “The Art and Science of Stormwater Retrofitting.” Deb Caraco, Center for Watershed Protection. April 12, 2010 • “Stormwater Retrofits: The Art of Opportunity.” CWP • Stearns & Wheler LLC Presentation to G/FLRPC August 27, 2010

  4. Genesee/Finger Lakes Region • Genesee • Livingston • Monroe • Ontario • Orleans • Seneca • Wayne • Wyoming • Yates

  5. Goals and Objectives • NYSDEC 604(b) Goal/Priority: • Develop planning activities to support implementation of “green infrastructure” as defined under the Clean Water Act • Our Proposal: • Partner with regional municipalities • Identify local “green infrastructure” stormwater retrofit opportunities • Provide them with a framework for implementing those projects • Conduct analysis of the local regulatory framework to ensure compatibility with local laws and to promulgate BMPs in BSD/LID

  6. Project Municipalities • Targeted geographic focus areas • Specific watersheds • Regulated MS4s • ~65 municipalities were mailed solicitation letters • Asked to submit a letter of interest justifying why they would like to participate • 10 responses – all were accepted

  7. What are Stormwater Retrofits? • Stormwater retrofits are stormwater management practices in locations where stormwater controls did not previously exist or were inadequate or ineffective (CWP) • Keep the water on-site • Infiltration • Evapo-transpiration • Reuse

  8. Typical Stormwater Retrofit Goals • Fix Past Mistakes & Maintenance Problems • Demonstration & Education • Reduce Pollutants of Concern • Alleviate Chronic Flooding Problems • Reduce Stormwater Runoff Volumes • Reduce Downstream Channel Erosion • Trap Trash & Floatables • Support Stream or Watershed Restoration Projects

  9. Typical Stormwater Retrofit Locations • Existing BMPs • Culverts • Storm Drain Outfalls • Parking Lots • Highway ROWs • Open Spaces

  10. Grassed Swales & Rain Gardens Planters and Tree Boxes Permeable and Porous Pavements Pocket Wetland

  11. “Storm Tank” Source: http://www.americaninfratech.com/bw.html

  12. CWP: Eight Steps to Stormwater Retrofitting Step 1.  Preliminary Watershed Retrofit Inventory Step 2.  Field Assessment of Potential Retrofit Sites Step 3.  Prioritize Sites for Implementation Step 4.  Public Involvement Process Step 5.  Retrofit Design Step 6.  Permitting Step 7.  Construction Inspections Step 8.  Maintenance Plan

  13. Step 1.  Preliminary Watershed Retrofit Inventory • Administering short survey with each lead contact • Generating local stormwater goals • Badly performing existing facilities • Inflow and Infiltration • Green Spaces • Waterbodies of concern, TMDL priorities • Where possible, generate a list of potential sites • Conduct face to face follow-up • Begin preliminary desktop analysis

  14. Step 2.  Field Assessment of Potential Retrofit Sites • Develop inventory tool • Look for pollution prevention opportunities in the field • Conduct a ground-truth to determine what will work • Prepare a conceptual sketch and take photographs

  15. CWP Retrofit Reconnaissance Form Source: D. Caraco, CWP

  16. CWP Retrofit Recon. Form Source: D. Caraco, CWP

  17. Basic Desktop Analysis and Sketch Plans Source: D. Caraco, CWP

  18. Step 3: Prioritize Sites for Implementation • Information collected can be used to prioritize projects them locally and regionally • Consider cost effectiveness, logistical feasibility, potential for public/environmental benefit EXAMPLE Table Source: Stearns & Wheler LLC

  19. Step 4: Local Law Review • No G/FLRPC project is complete without a local law “gap analysis”! • Analysis will seek to review existing laws, identify any potential conflicts and provide recommendations for BSD/LID

  20. Final Project Outcomes • Prioritized list of feasible stormwater green infrastructure projects • Basic overview/framework to assist municipalities with next steps regarding implementation, including any necessary public outreach • Accompanying local law analysis

  21. Questions? Contact Information Brian C. Slack, AICP Senior Planner – G/FLRPC bslack@gflrpc.org Green Infrastructure and Low Impact Development Evaluation and Implementation Plan http://gflrpc.org/GreenInfrastructure.htm