xNOTAM Project (EUROCONTROL)

xNOTAM Project (EUROCONTROL). EUROCONTROL AIM Strategy. AIM. Services. Equipments. People. Digital NOTAM. Information. Optimal benefit of resources Synchronisations of events and their consequences. Data centric. Objectives. for people. for machines. AIP. NOTAM. EAD (2007).

nancybmoore
Download Presentation

xNOTAM Project (EUROCONTROL)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. xNOTAM Project (EUROCONTROL)

  2. EUROCONTROL AIM Strategy AIM Services Equipments People Digital NOTAM Information • Optimal benefit of resources • Synchronisations of events • and their consequences Data centric

  3. Objectives for people for machines AIP NOTAM EAD (2007) DATA

  4. Scope

  5. Why digital NOTAM • Safety • SESAR (Single European Sky - ATM Research) • 2020: safety x 10 • Current situation • NOTAM overwrite database • Digital NOTAM can help

  6. Why digital NOTAM TWR ATIS PIB Could avoid such situations !?!

  7. Why digital NOTAM 56 feet

  8. Why digital NOTAM Current text PIB • AIXM Tempdelta • Reduced TORA • WIP • What digital NOTAM could have changed

  9. Why digital NOTAM • AIXM Tempdelta • Reduced TORA • WIP • What digital NOTAM could have changed

  10. Why digital NOTAM • AIXM Tempdelta • Reduced TORA • WIP • What digital NOTAM could have changed

  11. Why digital NOTAM AIP AIP NOTAM NOTAM <AIXM/XML> eliminate manual re-typing of information • Efficiency avoid misunderstandings … I assume"before" the threshold rather than "beyond“ ?!… … a crane 520 m in front of THR 24 …

  12. Why digital NOTAM enabler • Capacity

  13. Project risks ? • What if … • no immediate return of the investment? • regional isolated implementation? • non-conformity with end-user specifications? Mitigation

  14. Implementation plans (Europe)

  15. 2007 - xNOTAM Trial

  16. 2007 – xNOTAM Trial • When • Aug 2007 – March 2008 (tentative) • Coordination with FAA trial • same messages • 2 sources for test clients • same time • Will keep you informed on www.aixm.aero