1 / 7

Interoperability with regard to Boundary Conditions

Interoperability with regard to Boundary Conditions. Alfred Hofstadler Meteorological Applications Section Operations Department ECMWF. Boundary Conditions. ALADIN/LACE ARPEGE Some tests with IFS (Hungary) Promising results Needs pre-processing to generate FA (Fichier ARPEGE)

meryle
Download Presentation

Interoperability with regard to Boundary Conditions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interoperability with regard to Boundary Conditions Alfred Hofstadler Meteorological Applications Section Operations Department ECMWF EUMETNET SRNWP Interoperability Workshop 2008

  2. Boundary Conditions • ALADIN/LACE • ARPEGE • Some tests with IFS (Hungary) • Promising results • Needs pre-processing to generate FA (Fichier ARPEGE) • Timeliness issue • COSMO • GME: ARPA-SMR, DWD, IMGW • IFS: HNMS, Meteo Swiss, UGM, (LEPS) • HIRLAM • IFS EUMETNET SRNWP Interoperability Workshop 2008

  3. ECMWF Boundary Conditions • Optional Project • Four times a day at 00, 06, 12 and 18 UTC • Fully integrated into ECMWF operational system: • Main deterministic runs at 00 and 12 UTC cycles are used to generate Boundary Conditions products • Special BC runs at 06 and 18 UTC (identical configuration) • IFS: T799 (~25km) L91 (surface-80km) • 4D-Var with 6-hour data assimilation window • Forecast with 3-hourly post-processing 0-78 hours • Dissemination • Interpolation, rotation, frames, “bitmaps”, backup-products • GRIB only EUMETNET SRNWP Interoperability Workshop 2008

  4. EUMETNET SRNWP Interoperability Workshop 2008

  5. BC Products and Backup Products: Four times a day at 00, 06, 12 and 18 UTC FC-Steps An 6 12 78 84 90 BC Runs Products An 78 Backup +6 An 78 Backup +12 An 78 EUMETNET SRNWP Interoperability Workshop 2008

  6. ECMWF BC Schedule (from 29-02-2008) EUMETNET SRNWP Interoperability Workshop 2008

  7. ECMWF BC Interoperability Issues • Requirements not supported in Dissemination system: • Special GRIDs, FORMATs, …? Solutions: • Short term: framework for time-critical applications • Long term: modifications to production system • Timeliness: • ARPEGE and GME have shorter data cut-off Solutions: • Short term: use 06 and 18 UTC cycles • Long term: review production system • Access for non-ECMWF-BC members • EPS Boundary Conditions EUMETNET SRNWP Interoperability Workshop 2008

More Related