Fields instrument risks status
Download
1 / 15

FIELDS Instrument Risks Status - PowerPoint PPT Presentation


  • 75 Views
  • Uploaded on

FIELDS Instrument Risks Status. 5. 4. PSM. F8. 3. PS. F9. Likelihood of Occurrence (probability). 2. P. P. P. P. P. F6. F1. F2. F5. F7. CS. P. P. CS. CS. F3. F13. F10. F12. F11. 1. 1. 2. 3. 4. 5. Consequence of Occurrence (Impact).

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' FIELDS Instrument Risks Status' - meira


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Fields instrument risks status
FIELDS Instrument Risks Status

5

4

PSM

F8

3

PS

F9

Likelihood of Occurrence (probability)

2

P

P

P

P

P

F6

F1

F2

F5

F7

CS

P

P

CS

CS

F3

F13

F10

F12

F11

1

1

2

3

4

5

Consequence of Occurrence (Impact)

Mitigation Plans in Place for All FIELDS Risks


Fields phase b risks mitigation
FIELDS Phase B Risks Mitigation

  • FIELDS Risk Mitigation activities for Phase B include:

  • Antenna Qualification:

    • Nb materials testing, optical props aging (~Feb to Apr ‘12 TBR(was 3/12), MSFC or EMTL(was Odeillo, France))

    • Antenna model thermal testing (~Oct ‘12 to Jan ‘13 (was 3/13), Odeillo, France)

    • Additional contingency test, if needed (~Oct ‘13, Odeillo, France)

  • SCM / MAG / FGM Trade:

    • Determine the optimal technical (dynamic range) & resource (mass and thermal) solution (close by 4/12)

    • See Trades Slide for additional information.

  • MAG Performance Over Temperature:

    • MAG Cold Operations Test (~1/13)

    • MAG Thermal Cycling Test (end of Phase B)

  • MAG/SCM Interference:

    • MAG/SCM Interference test (similar to the MAG/FGM test performed in 7/11) (~5/12 TBR (was 4/13), Chambon, France)

    • Blue = change since MDR



F1 p risk burn down
F1-P:Risk Burn Down

A

25

20

Risk Grade

15

B

10

5

C

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F2 p risk burn down
F2-P: Risk Burn Down

25

20

Risk Grade

15

10

5

A

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F3 cs risk burn down
F3-CS: Risk Burn Down

A

25

20

Risk Grade

15

B

10

5

C

D

E

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F5 p risk burn down
F5-P: Risk Burn Down

25

20

Risk Grade

15

C

10

5

AB

D

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F6 p risk burn down
F6-P: Risk Burn Down

A

25

B

20

Risk Grade

15

10

5

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F7 p risk burn down
F7-P: Risk Burn Down

A

25

B

20

Risk Grade

15

C

10

5

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F8 psm risk burn down
F8-PSM: Risk Burn Down

A

25

20

Risk Grade

15

10

5

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F9 fs risk burn down
F9-FS: Risk Burn Down

A

25

B

20

Risk Grade

15

10

5

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F10 ps risk burn down
F10-PS: Risk Burn Down

A

25

B

20

Risk Grade

15

C

10

5

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F11 s risk burn down
F11-S: Risk Burn Down

A

25

B

20

Risk Grade

15

C

10

5

D

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F12 p risk burn down
F12-P: Risk Burn Down

A

25

B

20

Risk Grade

15

C

10

5

D

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


F13 p risk burn down
F13-P: Risk Burn Down

A

25

20

Risk Grade

15

10

5

Plan

Actual

* Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion


ad