FIELDS Instrument Risks Status

FIELDS Instrument Risks Status. Retired. 5. 4. 3. PS. F9. Likelihood of Occurrence (probability). 2. P. P. P. P. P. F5. F1. F2. F6. F7. S. P. CS. CS. P. P. CS. F10. F15. F12. F13. F11. F14. F16. 1. 1. 2. 3. 4. 5. Consequence of Occurrence (Impact). High.

reyna
Download Presentation

FIELDS Instrument Risks Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FIELDS Instrument Risks Status Retired 5 4 3 PS F9 Likelihood of Occurrence (probability) 2 P P P P P F5 F1 F2 F6 F7 S P CS CS P P CS F10 F15 F12 F13 F11 F14 F16 1 1 2 3 4 5 Consequence of Occurrence (Impact) High Medium Low (Criticality) Mitigation Plans in Place for All FIELDS Risks

  2. Risk Notes: December 2012 • F3 - Foreign Funding (commitment) (chart 7): - Risk retired and replaced with a more relevant, SCM-specific risk; New risk F15 – SCM Funding Issues • F15 – SCM Funding Issues (chart 17):If foreign funding sources fail • then we may lose the French search coil sensor and would switch to the backup - created to capture the SCM-specific funding issues • - expect CNES to re-evaluate SCM funding by Jan or Feb ‘13 • - if CNES does not sign the LOA explore: • - alternate HW source (3D Plus) for LPCE; or • - funding the backup option at Goddard • 3) F16 – MEP Thermal Environment (chart 18): If the MEP high temperature AFT remains over 55 deg C; Then FIELDS heritage electronics may need to be re-designed to accommodate the higher flight temperature.- RiMEP panel temperature is expected to be 55 deg C so, flight temperature may be 65 deg C which may lead to some parts issues. Change approach to mitigation if it's determined that parts need to be changed. • - Determine if the MAVEN thermal design is adequate for FIELDS (end of 1/13) • - Confirm all parts meet the MEP high temp AFT (by iPDR)

  3. Backup

  4. F1-P:Risk Burn Down A 25 20 Risk Grade 15 B 10 5 C Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  5. F2-P: Risk Burn Down 25 20 Risk Grade 15 10 5 A Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  6. F3-CS: Risk Burn Down A 20 15 Risk retired on 12/12/12 - Replaced with risk F15 Risk Grade 10 B 5 Plan Actual C D E * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  7. F5-P: Risk Burn Down 25 20 Risk Grade 15 C 10 5 AB D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  8. F6-P: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  9. F7-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  10. F8-PSM: Risk Burn Down Risk Retired A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  11. F9-FS: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  12. F10-PS: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  13. F11-S: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  14. F12-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  15. F13-P: Risk Burn Down A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  16. F14-S: Phase B Contract A B 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  17. F15-CS: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  18. F16-P: MEP Thermal Environment A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion