1 / 12

Next-Gen Nanosatellite Design for Sustainable Development Goals

Join the Nanosat Student Initiative and design the next generation of nanosatellites that combine new technologies and address earth-observation challenges aligned with the Sustainable Development Goals. Explore various disciplines, conduct experiments, and create models to tackle sub-topics such as thermal protection, lightweight materials, structural optimization, on-board systems design, positioning and propulsion, logistics, business planning, environmental considerations, and overall integration. Collaborate with experts and contribute to the Repository Analysis, Prototype Conceptualization, and R&D. Minimum 3-year commitment.

Download Presentation

Next-Gen Nanosatellite Design for Sustainable Development Goals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nanosat Student Initiative (1st thoughts, September 3, 2019)

  2. The student challenge: to design next-generation of nanosatellite(s) which combine new technologies and earth-observation challenges fulfilling Sustainable Development Goals. This will require detailed investigations among and across several disciplines where both experimental and modelling approaches are welcome. Potential sub-topics could include, among others: • Thermal: thermal protection systems, insulation…. • Materials: light-weight materials development and characterization wrt thermo-mechanical fatigue, creep etc… • Structures: static and dynamic behaviour of integrated, multi-purpose structures for the full application range; optimization of structural layout… • Systems: design of on-board systems; electronics, power generation, communications and data links… • Positioning & Propulsion: • Operation, Logistics, Business: network infrastructures and interfaces, launch planning, cost assessment for development-manufacturing-exploitation, commercial viability… • Environmental issues: … • Overall Design and Integration

  3. PossibleWorking Groups? WG10: Environmental issues

  4. Initiative overview Main Objective Repository Analysis. Potential targeted experimentation actions. Dedicated Effort Minimum effort is 3 years; If EU funding available it could be extended. Phase I Phase III Phase II Main Objective Prototype Conceptualization based on I and II. Conceptualization Approx. 1 year Ramping-up Approx. 1 year Analysis Approx. 1 year Main Objective Repository (peer reviewed) of challenge-specificR&D&I. Time

  5. Phase I: Ramping-up

  6. Phase II: Repository Analysis

  7. Phase II: Repository Analysis

  8. Phase III: Conceptualization

  9. Phase III: Conceptualization

  10. High Level Gantt Chart • Minimum effort is 3 years; • If EU funding available it could be extended. Repository Dedicated R&D&I Repository Synthesis. Potential extra experimentation/simulation tailored to students. Prototype Conceptualization (activity realised by all students) Basic Collaborative Platform Advanced Collaborative Platform Increasing in-kind effort required Increasing EU funding useful.

  11. Next steps: organizing the ramping up Meeting • Identify & invite the willing to take part in this initiative. • Populate the different Working Groups and challenges. • Nominate WG Coordinators. • Start developing the R&D&I repository.