1 / 2

Beam position on the TIDVG 2004-2014

Beam position on the TIDVG 2004-2014. MKDV1 June 2004 : 2 (was the firsts) – at 52 kV PFN Operating voltage progressively set down from 49 to 47.3 kV PFN between June 2004 and Oct. 2006 MKDV1 Oct. 2006 : 1 - Operating voltage set to 40 kV PFN

malory
Download Presentation

Beam position on the TIDVG 2004-2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam position on the TIDVG2004-2014 • MKDV1 June 2004: 2 (was the firsts) – at 52 kV PFN • Operating voltage progressively set down from 49 to 47.3 kV PFN between June 2004 and • Oct. 2006 • MKDV1 Oct. 2006 : 1 - Operating voltage set to 40 kV PFN • Magnet MKDV1 roughly repaired during the 2006-2007 shutdown • Run 2007 at VPFN = 49 kV (TBC), no flashover • Run 2008 at VPFN = 49 or more ? kV, no flashover • Magnet MKDV1 exchanged – new one includes transition pieces and PT100 - during the • 2008-2009 shutdown • Run 2009 at VPFN = 49 kV (TBC), no flashover ? • Viliam’s modification on PFN and TMR to reduce the PFN voltage by 4% while keeping same kick • Run 2010 at VPFN = 47.5 kV, no flashover • MKDV2 Nov. 2011 : 1 ; no spare for MKDV2 (larger aperture) • End of run 2011 at VPFN = 39 kV, no flashover • MKDV2 reconditioned during SD 2011-2012 • Run 2012 at VPFN = 41.4 kV, no flashover • MKDV2 repaired during LS1 but not fullt tested (was long and difficult to condition)- • proposed VPFN = 41.4 kV • Before being 41.4 kV it was 44 kV • Run2 (2014) VPFN = 47.5 kV End 2012 – 41.4 kV Distributions truncated at 3s

  2. Beam position on the TIDVG2004-2014 Beam centroid on the block – 288 bunches

More Related