Tc scp tec status report to plenary 63
This presentation is the property of its rightful owner.
Sponsored Links
1 / 14

TC SCP TEC STATUS REPORT TO PLENARY #63 PowerPoint PPT Presentation


  • 91 Views
  • Uploaded on
  • Presentation posted in: General

TC SCP TEC STATUS REPORT TO PLENARY #63. Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle. SCP(14)000090r1. Meetings Since Last TC SCP Plenary. SCP TEC #51 10-14 March 2014 Sophia-Antipolis, France (ETSI). Discussions, hot topics (1/4).

Download Presentation

TC SCP TEC STATUS REPORT TO PLENARY #63

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Tc scp tec status report to plenary 63

TC SCP TEC STATUS REPORT TO PLENARY #63

Paul JOLIVET, Chairman, LG ElectronicsSebastian HANS, Vice chairman, Oracle

SCP(14)000090r1


Meetings since last tc scp plenary

Meetings Since Last TC SCP Plenary

  • SCP TEC #51

    • 10-14 March 2014

    • Sophia-Antipolis, France (ETSI)


Discussions hot topics 1 4

Discussions, hot topics (1/4)

  • General issues, meeting schedule

    • Meeting organisation

      • The last meeting was a 5-day meeting

      • eUICC input represents the biggest part of the workload

      • Next meetings are all scheduled to be 5 day meetings

      • Meeting schedule until July 2014 proposed, ongoing checks on dates until the end of year 2014

  • eCAT

    • Corrections to eCAT and eCAT Secure Channel were accepted (CRs provided)

    • CR were proposed for the API part of eCAT

      • Postponed for further work

      • An API ad hoc session (F2F or conference call) to be planned


Discussions hot topics 2 4

Discussions, hot topics (2/4)

  • Embedded UICC (eUICC)

    • Draft specification

      • Draft 0.0.5 the specification is available

      • Input is delivered in pCRs

      • 2 pCRs were accepted and the draft specification updated accordingly

    • GSMA specification was attached to a LS to TEC

      • The document was presented to the meeting although there were objections from some members

      • There is no intention to copy or reference the full document

      • It is expected that interested companies will make contributions based on this document if required


Discussions hot topics 3 4

Discussions, hot topics (3/4)

  • Liaison from/to 3GPP CT6

    • LS on maximum delay due to NULL bytes

      • SCP TEC waits feedback from 3GPP2 before making CRs

      • Postponed to next TEC

    • LS on optimisation of power consumption of MTC devices

      • Discussed during the meeting

      • Postponed for further work at next meeting

    • LS on removal of 3GPP related text in TS 102 223

      • 3GPP specific parameters were spotted

      • Removal is only possible after checking that 3GPP implement them (in TS 31.111


Discussions hot topics 4 4

Discussions, hot topics (4/4)

  • Contactless API testing

    • Some LSs and discussion with TEST

    • Response LS was sent to TEST

    • Some points were postponed to the next TEC meeting for further work and discussion

  • Contactless

    • A LS from NFC Forum was checked on the management of multiple SEs and HCI/NCI

      • This document was provided for information, no specific action was required,

      • Waiting for the agreement on requirements

    • Contactless P2P is put on hold, as there is no new contribution


Documents sent back by plenary

Documents sent back by Plenary

  • Coding of the SPI : SCP(14)000045

    • Sent back due to security concerns from Oberthur Technologies

    • The CR was split into two CRs by Orange prior TEC

    • SCPTEC(14)000013 is postponed for further work

    • SCPTEC(14)000014r2 was accepted at TEC (and presented to this meeting)

    • There is an agreement in the group that those CRs can be considered separately


Request for advice

Request for advice

  • None


Outcome documents crs

Outcome Documents – CRs

  • List of TEC accepted CRs available in SCP(14)000091r1

  • Change Requests

    • 2 CRs to TS 101 220

    • 8 CRs to TS 102 223

    • 1 CR to TS 102 225

    • 1 CR to TS 102 484

  • Statistics:

    • 12 CRs

    • Releases:

      • 1 on Rel-10

      • 4 on Rel-11

      • 7 on Rel-12

    • Categories

      • 1 Cat A

      • 1 Cat B

      • 3 Cat C

      • 3 Cat D

      • 4 Cat F


Outcome documents wids

Outcome Documents – WIDs

  • New WID

  • None

  • Updated WID

    • None


  • Outcome documents tss

    Outcome Documents – TSs

    • None


    Outcome documents lss

    Outcome Documents – LSs

    • LS to SCP

      • None

    • LS cc SCP

      • to 3GPP TSG CT6 : SCP(14)000051r1 - Removing 3GPP related information from TS 102 223 (BCCH, Timing Advance, LND)

      • to ETSI SCP TEST : SCP(14)000024r5 – Answer to two TEST Clarification requests

    • Other LS

      • SCPTEC(14)000047r2 LS to REQ on Naming of off-card entities of the eUICC


    Next steps milestones

    Next Steps / Milestones

    • Open topics:

      • Contactless P2P

        • Documents where noted

        • New input is expected to reopen discussion

      • Secure Channel API

        • Input discussed, limited feedback slowly moving topic

      • eUICC

        • Long discussions

        • Exchanges with REQ

        • High workload expected

      • and TEI…


    Meeting schedule tc scp tec

    Meeting Schedule TC SCP TEC

    • SCP TEC #52

      • 2-6 June 2014

      • Seoul, Korea (Samsung)

    • SCP TEC #53

      • 7-11 July 2014

      • Sophia-Antipolis, France

    • SCP TEC #54

      • Beginning Oct 2014

      • TBC

    • Conference calls

      • To be planned depending on participants’ availability

    • Ad hoc meetings

      • Potential ad hoc for eCAT API

      • Other if required

    • Joint sessions

      • None scheduled at that stage


  • Login