REPLACEMENT OF OBSOLETE INSTRUMENTATION CONTROL IN KANUPP CHALLANGES FACED. - PowerPoint PPT Presentation

REPLACEMENT OF OBSOLETE INSTRUMENTATION  CONTROL IN KANUPP  CHALLANGES FACED.

  • 241 Views
  • Uploaded on
  • Presentation posted in: General

INTRODUCTION. Karachi Nuclear Power Plant ( CANDU type,137MWe) was designed in the mid 60's. The control and instrumentation (C

I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.

Download Presentation

REPLACEMENT OF OBSOLETE INSTRUMENTATION CONTROL IN KANUPP CHALLANGES FACED.

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


  • Login