An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RLS components: repairs and spare status RPC Link System Executive Meeting, 28 April 2010

  2. RPC Link System Inventory * Installed in UXC and working correctly (after GOL replacment) Maciek Kudła, University of Warsaw

  3. MLBs 112 boards damaged; • 47: repaired, tested and installed on detector • GOL replacment – 47, • 50: GOL replaced, tests in progress, • 15: problem to be localised. Maciek Kudła, University of Warsaw

  4. SLBs 41 boards damaged • 41: problem to be localised. Low priority – sufficient number of spare modules Maciek Kudła, University of Warsaw

  5. CBs 30 boards damaged • 20: repaired and partially tested, • CCU – 10, • LVDS drivers in CCU ring – 4, • Xilinx – 3; • 9: waiting for Xilinx replacment, • 1: problem to be localised. Maciek Kudła, University of Warsaw

  6. CBICms 7 mezzanines damaged • 20 boards ordered. Should be available at the and of May. Maciek Kudła, University of Warsaw

  7. Conclusions • Satisfactory results of RLS components repairs • Low cost (150 instead 1000 CHF when additional production made), • Good efficiency, • But: tests in 904 needed: eye diagram, configurations, data transfer, etc • The end of June – we should have enough spares for all RLS components and RLS spare components problem solved. Maciek Kudła, University of Warsaw