1 / 7

Kent Route Director Andrew Munden

Kent Route Director Andrew Munden. November 2008. Agenda. Introduction Network Rail’s Role Network Capacity Network Constraints Timetable Development Process London Bridge Station Station Improvements Questions. Network Rail Does: Operate, maintain, renew and enhance the network

kieran-huff
Download Presentation

Kent Route Director Andrew Munden

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kent Route DirectorAndrew Munden November 2008

  2. Agenda • Introduction • Network Rail’s Role • Network Capacity • Network Constraints • Timetable Development Process • London Bridge Station • Station Improvements • Questions

  3. Network Rail Does: Operate, maintain, renew and enhance the network Co-ordinate the production of RUSs Allocate timetable slots according to route capacity constraints Operate the 18 largest stations on the network Network Rail Does Not: Specify train services including destination, frequency or rolling stock Operate train services Operate stations other than the 18 largest stations on the network Network Rail

  4. Network Constraints

  5. Timetable Development Process • DfT specifies the timetable through franchise awarded to the train operator, in Greater London TfL has options to request enhancement to services • TfL, and other transport bodies and other affected passenger and freight operators are consulted on changes • TOC submits bids and Network Rail consults on operability of the base timetable with affected parties • Network Rail undertakes Timetable modelling • TOC publishes the detailed timetable

  6. Station Improvements Considered • Queen’s Road Peckham • East Dulwich • Denmark Hill

  7. Thank you • Any questions?

More Related