1 / 10

Procurement for the Supporting Systems for the RF-Structures of the CLIC-Module

Procurement for the Supporting Systems for the RF-Structures of the CLIC-Module. Index. Boostec. Epucret. Micro- Controle. Boostec (SiC) Epucret (Mineral Cast) Micro- Controle (complete Supporting System) Summary & Actions. BOOSTEC  2* DB [Type 0]. Work in Progress

keefe
Download Presentation

Procurement for the Supporting Systems for the RF-Structures of the CLIC-Module

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Procurementfor the Supporting Systems for the RF-Structures of the CLIC-Module Nick Gazis, CERN-BE/RF & NTU-Athens

  2. Index Boostec Epucret Micro-Controle • Boostec (SiC) • Epucret (Mineral Cast) • Micro-Controle (complete Supporting System) • Summary & Actions Nick Gazis, CERN-BE/RF & NTU-Athens

  3. BOOSTEC  2* DB [Type 0] Work in Progress with the aim of producing Baseline DB Type 0 SiC Girder technical drawing Updated Girder with integrated V-Supports (June 2010) Nick Gazis, CERN-BE/RF & NTU-Athens

  4. Epucret 2* Girders [Type 0] Updated Girder with integrated fixation components (August 2010) Nick Gazis, CERN-BE/RF & NTU-Athens

  5. Prototype Girders Fabrication & MS 16th week 2010: OFFER for the complete Supporting System of 2 MB Type 0 girders Nick Gazis, CERN-BE/RF & NTU-Athens

  6. Summary & Actions • Feasibility check – Design/Offer under way (according to baseline) • SiC Girder with Integrated V-Supports (Boostec)  (ordered) • Supporting Systems complete tender & Actuators (Micro-Controle)  (offer on current week) • Mineral Cast Girder (Epucret)  (ordered) • Carbon Fiber Girder (Hexcel)  (MS) • Metal Foam Girder(Alulight)  (MS) • Orders issued for the girder earliest delivery deadlines (summer 2010) • Girder and DB-quad supporting plate draft designs(in progress to be compatible for the offers design) • Progress on the cradle–girder interface according to the updated cradle design and the girder fabrication feasibility Nick Gazis, CERN-BE/RF & NTU-Athens

  7. Thank you! Nick Gazis, CERN-BE/RF & NTU-Athens Nick Gazis, CERN-BE/RF & NTU-Athens 7

  8. CLIC-Module MB & DB Girder of SiC Alternative Configuration • Girder Baseline Configuration: • Max. Vertical & Lateral Deformation at 10μm • Max. Girder Weight at 240kg • Max. Girder Length of 2m • Max. Load on top of the Girder 400kg/m (distributed weight) • Rectangular Space Reservation of External Dimensions of [320*150]mm • References Surfaces (as presented) of 30mm surface width Baseline Configuration with Reference Surfaces Supplementary Slide 350 mm 150 mm 150 mm 350 mm • Handling Zones Nick Gazis, CERN-BE/RF & NTU-Athens

  9. DB-Quad Supporting Plate preliminary design • Space Reservation compatible with the preliminaryconfiguration of the DB-Quad supporting plate design. • Update of the design and new compatibility check should be made after the final DB-Quad design and integration. • Fixation , contact and reference surfaces are dedicated to the girder baseline configuration. Supplementary Slide Draft design (to be updated) Nick Gazis, CERN-BE/RF & NTU-Athens

  10. Draft List of Companies under investigation for feasible CLIC-Module Girder Fabrication Supplementary Slide Nick Gazis, CERN-BE/RF & NTU-Athens

More Related