V0 analysis progress
This presentation is the property of its rightful owner.
Sponsored Links
1 / 10

V0 analysis progress PowerPoint PPT Presentation


  • 61 Views
  • Uploaded on
  • Presentation posted in: General

V0 analysis progress. JunGyu Yi [email protected] HIPEx Local Meeting 20120518. AliAnalysisTaskPerformanceStrange. https://hipex.phys.pusan.ac.kr/drupal/node/ 215 Class AliAnalysisTaskPerformanceStrange.cxx AliAnalysisTaskPerformanceStrange.h runEx01.C. test result.

Download Presentation

V0 analysis progress

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


V0 analysis progress

V0 analysis progress

JunGyu Yi

[email protected]

HIPEx Local Meeting 20120518


Alianalysistaskperformancestrange

AliAnalysisTaskPerformanceStrange

  • https://hipex.phys.pusan.ac.kr/drupal/node/215

  • Class

    • AliAnalysisTaskPerformanceStrange.cxx

    • AliAnalysisTaskPerformanceStrange.h

    • runEx01.C

HIPEx Local 20120518


Test result

test result

/alice/data/LHC10b_000117116_p2 | /alice/data/LHC10b_000117113_p2

HIPEx Local 20120518


Alianalysistaskperformancestrange1

AliAnalysisTaskPerformanceStrange

  • from $ALICE_ROOT/PWG2/SPECTRA/

  • AliAnalysisTaskPerformanceStrange.cxx

    • fAnalysisMC(0 or 1), fUsePID(0 or 1), fUseCut(0 or 1)

    • mc or real data, PID, Cut 여부 결정

  • AliAnalysisTaskPerfromanceStrange.h

    • AliAnalysisTaskPerformanceStrange.h파일은 Histogram을 추가/수정할 경우 변경

  • runEx01.C

    • neutral V0 particle (Lambda & K_short) reconstruction은 $ALICE_ROOT/STEER class->libSTEERBase 에  있는 library/class를 통해서 가능

    • runEx01.C 에서 library를load함.

HIPEx Local 20120518


Proof stage

Proof stage

  • http://aaf.cern.ch/node/223

  • Procedure on ROOT

    • TProof::Open(“jungyu:[email protected]);

    • gProof->ShowPackages();

    • gProof->EnablePackage("[email protected]::1.0.0")

    • Run the wizard : gProof->afDataSetWizard()

    • or afDataSetQuick.C

      • void afDataSetQuick()Bool_tsim, /* kTRUE => sim, kFALSE => data */TStringperiod, /* e.g., "LHC10h" */TStringrunRange, /* e.g., "139104-139107,139306" */Bool_tesd, /* kTRUE => ESDs, kFALSE => AODs */TStringpass, /* e.g, "1", "pass1", "1_HLT", "pass1_HLT" */Int_taodNum, /* e.g., 40 for AOD040 */TStringoptions /* e.g., "dryrun:aliencmd" */

    • Remove datasets

      • TProof::Open(“jungyu:[email protected]","masteronly");

      • gProof->RemoveDataSet(“/default/jungyu/name-of-data-set”);

HIPEx Local 20120518


Staged on kisti

Staged on KISTI

HIPEx Local 20120518


Plans

plans

  • AliAnalysisTaskPerformanceStrange

    • run with (parts of) LHC10h, LHC11h on PROOF

    • cut, PID study

    • Background substractionand Fitting study

  • Discussion in advance

    • On going HMPID analysis

      • Performance : Update on LHC11h - GiacomoVolpe (INFN)

      • Plots on PID (track-by-tarck) – Levente Molar (Hungarian Academy of Sciences (HU)

      • Spectral Analysis : Francesco Barile(INFN)

        • https://indico.cern.ch/conferenceDisplay.py?confId=190037

      • Jet on HMPID with PID : SonaPochybova (Hungarian Academy of Sciences (HU))

        • https://indico.cern.ch/conferenceDisplay.py?confId=189078

      • PID in jets with the HMPID : DavidePerrino(INFN)

        • https://indico.cern.ch/conferenceDisplay.py?confId=191029

      • Correlations with the HMPID 20' Speaker: BencediGyula (Wigner Institute Budapest) ,

        • https://indico.cern.ch/conferenceDisplay.py?confId=181670

    • Try to contact during May-July visit

HIPEx Local 20120518


Vhmpid

Plan and News

https://hipex.phys.pusan.ac.kr/drupal/node/475

https://hipex.phys.pusan.ac.kr/drupal/node/495

VHMPID

HIPEx Local 20120518


Schedule

Schedule

  • 5/31~6/11, 1st Beam Time

    • is more technical

    • the main aim is to commission and understand the pressurized system.

  • 6/25~7/9, 2nd Beam Time

    • The real serial measurement

    • with shifts for data taking and analysis.

  • September : GEM with liquid radiator.

    • ~ 3 weeks

    • share beam time with TPC upgrade test will be discussed

  • Oct.-Nov. : Beam Test, Physics Run.

HIPEx Local 20120518


V0 analysis progress

Plan

  • HIPExer Visiting

    • 5/30 ~7/12

    • Jihye & Jungyu : Flight, Housing Reserved - & Yoonsung?

  • Jungyu- What to do : contact person

    • Pressurized System Work/Study : CosimoPastore*, GyorgyBencze

    • Beam Test Shift : GyorgyBencze* et al.

    • Beam Test Analysis : Michael Weber*, Antonello Di Mauro, LeventeMonlar, GyorgyBencze

    • Plan will be present on Ko-ALICE meeting , May 23.

HIPEx Local 20120518


  • Login