160 likes | 327 Views
UAE GO TEAM VISIT 2014. Visit Summary. Erwin Lassooij PBN Programme Manager 30 January 2014. Purpose. Increase the global implementation of PBN through: Improved capability in the use of the PBN concept in planning / designing airspace
E N D
UAE GO TEAM VISIT 2014 Visit Summary Erwin Lassooij PBN Programme Manager 30 January 2014
Purpose • Increase the global implementation of PBN through: • Improved capability in the use of the PBN concept in planning / designing airspace • Improved capability in approving PBN Operations (Operations Approvals)
MID implementation status Dec 2014 Dec 2013
Participation • Bahrain • Iraq • Sudan • UAE
Go-Team Overview • 10 day PBN Airspace Design Workshop • ICAO Doc 9992: PBN in Airspace Design • Plan, Design, Validate, Implement • 17 steps • Integration of ICAO Doc 9931 & 9993: CDO and CCO • ICAO Circ 330: Civil / Miitary Cooperation in ATM • Designed routes and airspace in TMA • “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 • Routes designed for dual airports • Phuket / Krabi • Enroute design and multi-TMA integration practice • Southeast Asia
Lessons Learned • Team concept: diverse points of view and sources of information add strength • Setting goals and scope early helps insure success • Smaller projects allow for quick success • Take advantage of RNAV flexibility to design for shortest route • Design routes first then design airspace to contain routes • Design routes to minimize conflicts • Avoid the 100% trap – 80% of something is better than 100% of nothing • Rightsize the airspace according to tasks required • Avoid CDO route shortcuts to the extent possible • Shortcut CCO to the extent possible
Next Steps • Encourage participants to apply lessons learned in adapting PBN plan and Implement PBN targets • Submit PBN plans as per June 2014 (PBN Sub group) • ICAO Regional Office • Follow-up with letter to DG on focus points • First level of support
Next steps - assistance • ICAO Regional Office with assistance from experts out of the Region through • Regional Go-Teams 2014 • Oman • Jordan (Ops Approval only) • Qatar • Egypt • ICAO HQ • Standards and guidance material • Customized Go Teams
PBN Productsto help you with implementation • PBN related Publications and Annexes • Bundled specifically for Stakeholders • Hard and soft copies • eLibrary Solutions • PBN ikit • CBT Training (iLearn)
eLibrary • Built for Stakeholders • Simplifies search for relevant PBN information • From all ICAO Documentation • By March, 3 eLibrary based bundles: • PBN for Regulators (PBN_REGS) • PBN for ANSP-Airspace Designers (PBN_ANSP_AD) • PBN for Aircraft Operators (PBN_AC_OPS) • More stakeholder bundles to follow: • Executives • Manufacturers • ANSPs – Master, AIM/AIS, ATC, Instrument Flight Procedures Available through ICAO e-store: www.store1.icao.int
Documentation Framework • PANS Ops Volume II • PBN Manual (Doc 9613) 4th Edition • RNP AR Procedure Design Manual (Doc 9905) • PBN Ops Approval Manual (Doc 9997) • Manual on Use of PBN in Airspace Design (Doc 9992) • CDO Manual (Doc 9931) • CCO Manual (Doc 9993 • GNSS Manual (Doc 9849) • Procedure QA Manual (Vol 1 to Vol 6) • (Doc 9906) 4th Edition
The Future of PBN GO Teams • One more GO Team visit planned under Phase II • China (Dates and location TBD) • Future GO Team Visits will be specific to Region and State requirements for PBN Implementation • On request basis • Focus/Services provided will be: • PBN Assessments/Gap Analysis • PBN Plans • Training • Implementation Assistance Completed Global Visits Phase (I and II) Thailand (2) UAE (2) Mexico Kenya Germany India Ecuador Russia South Africa USA (CAR/SAM)