1 / 16

UAE GO TEAM VISIT 2014

UAE GO TEAM VISIT 2014. Visit Summary. Erwin Lassooij PBN Programme Manager 30 January 2014. Purpose. Increase the global implementation of PBN through: Improved capability in the use of the PBN concept in planning / designing airspace

judith
Download Presentation

UAE GO TEAM VISIT 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UAE GO TEAM VISIT 2014 Visit Summary Erwin Lassooij PBN Programme Manager 30 January 2014

  2. Purpose • Increase the global implementation of PBN through: • Improved capability in the use of the PBN concept in planning / designing airspace • Improved capability in approving PBN Operations (Operations Approvals)

  3. ROUTES - WORLD

  4. 41%

  5. MID implementation status Dec 2014 Dec 2013

  6. Participation • Bahrain • Iraq • Sudan • UAE

  7. Go-Team Overview • 10 day PBN Airspace Design Workshop • ICAO Doc 9992: PBN in Airspace Design • Plan, Design, Validate, Implement • 17 steps • Integration of ICAO Doc 9931 & 9993: CDO and CCO • ICAO Circ 330: Civil / Miitary Cooperation in ATM • Designed routes and airspace in TMA • “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 • Routes designed for dual airports • Phuket / Krabi • Enroute design and multi-TMA integration practice • Southeast Asia

  8. Lessons Learned • Team concept: diverse points of view and sources of information add strength • Setting goals and scope early helps insure success • Smaller projects allow for quick success • Take advantage of RNAV flexibility to design for shortest route • Design routes first then design airspace to contain routes • Design routes to minimize conflicts • Avoid the 100% trap – 80% of something is better than 100% of nothing • Rightsize the airspace according to tasks required • Avoid CDO route shortcuts to the extent possible • Shortcut CCO to the extent possible

  9. Next Steps • Encourage participants to apply lessons learned in adapting PBN plan and Implement PBN targets • Submit PBN plans as per June 2014 (PBN Sub group) • ICAO Regional Office • Follow-up with letter to DG on focus points • First level of support

  10. Next steps - assistance • ICAO Regional Office with assistance from experts out of the Region through • Regional Go-Teams 2014 • Oman • Jordan (Ops Approval only) • Qatar • Egypt • ICAO HQ • Standards and guidance material • Customized Go Teams

  11. PBN Productsto help you with implementation • PBN related Publications and Annexes • Bundled specifically for Stakeholders • Hard and soft copies • eLibrary Solutions • PBN ikit • CBT Training (iLearn)

  12. eLibrary • Built for Stakeholders • Simplifies search for relevant PBN information • From all ICAO Documentation • By March, 3 eLibrary based bundles: • PBN for Regulators (PBN_REGS) • PBN for ANSP-Airspace Designers (PBN_ANSP_AD) • PBN for Aircraft Operators (PBN_AC_OPS) • More stakeholder bundles to follow: • Executives • Manufacturers • ANSPs – Master, AIM/AIS, ATC, Instrument Flight Procedures Available through ICAO e-store: www.store1.icao.int

  13. Documentation Framework • PANS Ops Volume II • PBN Manual (Doc 9613) 4th Edition • RNP AR Procedure Design Manual (Doc 9905) • PBN Ops Approval Manual (Doc 9997) • Manual on Use of PBN in Airspace Design (Doc 9992) • CDO Manual (Doc 9931) • CCO Manual (Doc 9993 • GNSS Manual (Doc 9849) • Procedure QA Manual (Vol 1 to Vol 6) • (Doc 9906) 4th Edition

  14. The Future of PBN GO Teams • One more GO Team visit planned under Phase II • China (Dates and location TBD) • Future GO Team Visits will be specific to Region and State requirements for PBN Implementation • On request basis • Focus/Services provided will be: • PBN Assessments/Gap Analysis • PBN Plans • Training • Implementation Assistance Completed Global Visits Phase (I and II) Thailand (2) UAE (2) Mexico Kenya Germany India Ecuador Russia South Africa USA (CAR/SAM)

More Related