1 / 8

ARIEL Building

ARIEL Building. Pierre Bricault. Target Stations. Target station design utilises the experience we built over the 10 years of ISAC-I operation. Target module shielding plug Target Station #1 The first target station to be operational in July 2013

Download Presentation

ARIEL Building

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARIEL Building • Pierre Bricault

  2. Target Stations • Target station design utilises the experience we built over the 10 years of ISAC-I operation. • Target module shielding plug • Target Station #1 • The first target station to be operational in July 2013 • 25 kW of electron beam and 100 kW of proton beam. • Target Station #2 • Target station #2 to be operational in July 2017 • The design will accommodate 500 kW of electron beam. • In the 2010-2015 5YP it will be used for the 500 kW converter development test bed.

  3. Services • To service the beam lines and the target station we are planning to have a remote handling manipulator that will be attached to the overhead crane. • The remote handling manipulator need a space of 1.5 m on each side of the beam line centre. • The manipulator will service the following items: • Heavy-Ions Front-end Optics • Heavy-Ions Front-end Diagnostics • Front end vacuum • Object Slit • Image Slit • Laser Optics, window and prism • Proton Entrance diagnostics • Proton Beam dump

  4. Hot Cells • One for target exchange, • One for maintenance. • Ante room common to both hot-cell for service. • Conditioning Stations • To prepare the target for on-line operation we will have conditioning stations. • Storage vault for 24 targets • Shielded room to prepare spent target shipping.

  5. Faraday Cages and Laser ion source First target station 2013 Second target station 2017 Electron only P ~ 500 kW Electron and proton 1/2 remote handling building BL4N 200 µA; 450- 500 MeV 10 mA; 25 - 75 MeV 200 µA Proton Beam Dump