SPEC I – VYNMSA Miguel Aleman Industrial Park
Download
1 / 4

S AN NICOLAS / APODACA, N.L - PowerPoint PPT Presentation


  • 122 Views
  • Uploaded on

SPEC I – VYNMSA Miguel Aleman Industrial Park. I nventory B uilding / For L ease or S ale. P a r k L o c a t i o n. M ONTERREY METROPOLITAN AREA. L OCATION. S an Nicolás, N.L. (Miguel Alemán Industrial Park) Borderline with Apodaca. A DVANTAGES.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' S AN NICOLAS / APODACA, N.L' - jennis


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

SPEC I – VYNMSA Miguel Aleman Industrial Park

Inventory Building / For Lease orSale

P a r k L o c a t i o n

MONTERREY METROPOLITAN AREA

LOCATION

  • San Nicolás, N.L. (Miguel Alemán Industrial Park)

  • Borderline with Apodaca

ADVANTAGES

  • LOCATION: BORDER LINE APODACA / SAN NICOLAS -WITH IN THE MONTERREY METROPOLITAN AREA

  • AIRPORT: AT LESS THAN 15 MIN DRIVE

  • HIGHWAYS TO: SALTILLO – RAMOS , LAREDO, REYNOSA,

  • LABOR FORCE: QUALIFIED WALKING DISTANCE LABOR --- FORCE

  • CONTROLLED ACCESS: FENCED AND GATED.

  • POCKET PARK FLEXIBILITY: PARK LAYOUT CAN --- -------ACCOMMODATE A VARIETY OF BUILDING SIZES

  • -USE: MANUFACTURING WAREHOUSING DISTRIBUTION

  • TRANSPORTATION: PRIVATE & PUBLIC

  • INFRASTRUCTURE: WORLD CLASS

1. VYNMSA MIGUEL ALEMAN INDUSTRIAL PARK

2. VYNMSA RIDGE SANTA CATARINA INDUSTRIAL PK

3. LA SILLA APODACA INDUSTRIAL PARK

4. SABINAL INDUSTRIAL PARK

5. ACUEDUCTO INDUSTRIAL PARK

6. LA SILLA GUADALUPE INDUSTRIAL PARK

7. MONTERREY TECHNOLOGY PARK

8. VEP INDUSTRIAL PARK

9. VYNMSA RAMOS ARIZPE INDUSTRIAL PARK

10. VYNMSA MONTEMORELOS INDUSTRIAL PARK

11. AEROPUERTO TECHNOLOGY PARK

12. VYNMSA AEROPUERTO APODACA INDUSTRIAL PARK

13. OMA VYNMSA AERO INDUSTRIAL PARK

SAN NICOLAS / APODACA, N.L

PARK INFRASTRUCTURE

  • WATER ………………..……..

  • SEWER ………………….…..

  • - TELEPHONE LINES …..……..

  • - ENERGY ………..……………

  • GAS …………….……..………

(AYD)

(MUNICIPALITY)

(TELMEX)

(CFE)

(CIA MEXICANA DE GAS)

DISTANCE TO

-LAREDO, TX……………………………

-REYNOSA CITY…….………..………..

-MEXICO CITY………………………….

-MONTERREY DOWNTOWN…..…….

-SALTILLO / RAMOS ARIZPE..……….

-MONTERREY INTERNATIONAL -----AIRPORT ………………………………..

236 KM

210 KM

910 KM

10 KM

15 KM

15 KM

Ruben Calderon (04481-1555-5151) Contact us Ernesto Lopez (04481-8010-7290)

[email protected] [email protected]

T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m

Monterrey / San Luis Potosí / Querétaro / Montemorelos / Saltillo - Ramos Arizpe / Irapuato


SPEC I – VYNMSA Miguel Aleman Industrial Park

Inventory Building / For Lease orSale

P a r k G e n e r a l I n f o r m a t i o n

L O T A V A I L A B L E

RENDERING OF THE FACADE

Ruben Calderon (04481-1555-5151) Contact us Ernesto Lopez (04481-8010-7290)

[email protected] [email protected]

T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m

Monterrey / San Luis Potosí / Querétaro / Montemorelos / Saltillo - Ramos Arizpe / Irapuato


SPEC I – VYNMSA Miguel Aleman Industrial Park

L a S i l l a A p o d a c a I n d u s t r I a l P a r k

Inventory Building / For Lease orSale

P a r k G e n e r a l I n f o r m a t i o n

SPECS

BUILT AREA: 158,625 Ft² or 14,736 M2

LAND AREA: 28,805 M2

STRUCTURE: Pre Engineered Rigid Frame

ROOF SYSTEM: SSR,

4 in. Thermoacoustic Insulation

WALL SYSTEM: Thick precast concrete panels

with polystyrene, windows at the top

for natural lighting.

FLOOR SYSTEM: To be poured (according to client needs)

CLEAR HEIGHT: 30 Ft. ( 9,14 M at the lowest point)

DOCKS & RAMPS (6) docks & (4) trailer staging

RAMP (2) ramps

CAR PARKING: 143 spaces(room for more)

OFFICE: To be built (according to client needs)

LOT - A

358,300 ft2

8.2 acres

33,300 m2

LOT - B

312,000 ft2

7.1 acres

29,000 m2

30 Ft.

SAMPLE INTERIOR VIEW

LOT - D

191,500 ft2

4.3 acres

17,800 m2

LOT - E

161,400 ft2

3.7 acres

15,000 m2

Ruben Calderon (04481-1555-5151) Contact us Ernesto Lopez (04481-8010-7290)

[email protected] [email protected]

T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m

Monterrey / San Luis Potosí / Querétaro / Montemorelos / Saltillo - Ramos Arizpe / Irapuato


SPEC I – VYNMSA Miguel Aleman Industrial Park

L a S i l l a A p o d a c a I n d u s t r I a l P a r k

Inventory Building / For Lease orSale

P a r k G e n e r a l I n f o r m a t i o n

LOT - A

358,300 ft2

8.2 acres

33,300 m2

LOT - B

312,000 ft2

7.1 acres

29,000 m2

LOT - D

191,500 ft2

4.3 acres

17,800 m2

LOT - E

161,400 ft2

3.7 acres

15,000 m2

The last industrial site on the edge of the San Nicolas Urban Development (borderline with Apodaca),

abundant labor walking distance.

Ruben Calderon (04481-1555-5151) Contact us Ernesto Lopez (04481-8010-7290)

[email protected] [email protected]

T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m

Monterrey / San Luis Potosí / Querétaro / Montemorelos / Saltillo - Ramos Arizpe / Irapuato


ad