1 / 53

Lockout... Tagout... Tryout !

Lockout... Tagout... Tryout !. Failure to lock, tag and try electrical equipment is one of the top 5 causes of all fatal mining accidents. A presentation of. Metal and Nonmetal Safety & Health. Count the Cost of Not Locking Out. Metal-Nonmetal Electrical Lockout Injuries over 10 Years:.

jana
Download Presentation

Lockout... Tagout... Tryout !

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lockout...Tagout...Tryout ! Failure to lock, tag and try electrical equipment is one of the top 5 causes of all fatal mining accidents.

  2. A presentation of... Metal and Nonmetal Safety & Health

  3. Count the Cost of Not Locking Out... Metal-Nonmetal Electrical LockoutInjuries over 10 Years: 30 Fatalities 6 Permanent disabilities 257 Lost time injuries 45 Restricted day injuries

  4. A miner was fatally injured in this log roller when the motor was started while he worked inside. Electrical power had not been disconnected. This tragedy could have been avoided hadthe victim locked out the power to the machine.

  5. A miner was electrocuted when his handcame in contact with 480 volts. He did not lock, tag & try, nor was he wearing electrically rated gloves.

  6. Two men were injured when this distribution panel shorted out during a repair. Electrical energy had not been disconnected and locked out.

  7. Energy Sources to Control • Electricity • Machinery • Pressure lines & vessels • Sliding / falling material • Miscellaneous

  8. Hazardous energy must be controlled when: • Removing guards, covers, shields • Performing maintenance • Inspecting equipment internally • Troubleshooting • Unchoking

  9. The vast majority of electrical accidents occurs while work is being performed on energized circuits during maintenance or troubleshooting. Even the most qualified personnel sometimes seem to disregard the dangers and risks involved. Workers At-Risk

  10. Reasons Given for Not Locking Out • Waste of time - lost production time • Supervisor praise for fast repair • Only takes a ‘minute’ for repair on “energized” equipment • Fatigue: too far or too much trouble to turn off power • Finish undesirable task quickly • Finish before going home

  11. Why to Lock Out For myself For my family For my co-worker For my profession For my company

  12. FederalRegulations

  13. Distribution Boxes30 CFR 56/57.12006 • Distribution boxes shall be provided with a disconnecting device for each branch circuit. Such disconnecting devices shall be equipped or designed in such a manner that it can be determined by visual observation when such a device is open and that the circuit is deenergized, and the distribution box shall be labeled to show which circuit each device controls.

  14. A “distribution box” is an enclosed portable apparatus through which an electric circuit is carried to one or more cables from a single incoming feed line. Each cable circuit must be connected through an individual overcurrent protective device.

  15. The distribution box should be observable to indicate when the device is open and the circuit is deenergized. Where plugs are used to provide power, the plugs and cables need to be positively identified prior to any work on the equipment. Positive identification is essential to prevent an accident from occurring. The following photo displays why this is so important.

  16. Many distribution boxes and power centers have a window at each individual circuit where circuit deenergization can be visually determined

  17. Work on power circuits30 CFR 56/57.12017 • Power circuits shall be deenergized before work is done on such circuits unless hot-line tools are used. Suitable warning signs shall be posted by the individuals who are to do the work. Switches shall be locked out or other measures taken which shall prevent the power circuits from being energized without the knowledge of the individuals working on them.

  18. Work on electrically powered equipment30 CFR 56/57.12016 • Electrically powered equipment shall be deenergized before mechanical work is done on such equipment. Power switches shall be locked out or other measures taken which shall prevent the equipment from being energized without the knowledge of the individuals working on it.

  19. 30 CFR 56/57.12016, continued • Suitable warning notices shall be posted at the power switch and signed by the individuals who are to do the work. • Such locks or preventive devices shall be removed only by the persons who installed them or by authorized personnel.

  20. Electrically Powered Equip. • De-energize before mechanical work • Lock out power switches • Post warning notice • ID tag on lock is OK • Lock must be installed and removed only by person to whom it is issued

  21. BRANCH CIRCUIT DISCONNECTING DEVISES 30 CFR 57.12084. • Disconnecting switches that can be opened safely under load shall be provided underground at all branch circuits extending from primary power circuits near shafts, adits, levels and boreholes.

  22. LockoutHardware

  23. Locks

  24. Multi-lock adapters

  25. TagsTo quickly identify the workerwho is using the lock

  26. LockoutProcedures

  27. Prepare • Pre-plan • Coordinate w/ others • Operators, co-workers, contractors • Erect barricades / warning signs

  28. Shutdown • Use stop switch • If multiple switches, use one closest to equipment • Do not use disconnect switch to stop: arcing could cause injury / damage

  29. Isolate • Disconnect from all energy sources • Insulate self from electrical power • non-conductive platform, gloves, dry clothes • Stand to side of disconnect device, not in front • Avert eyes & face

  30. Left Hand DisconnectEyes Averted, Insulating Platform for Wet Conditions

  31. Right Hand MCC DisconnectStand Aside, Eyes Averted Insulated Gloves for Higher Voltage

  32. Lockout • Affix lock or appropriate device to disconnect switch • Do not lock out start / stop switch • Latch shackle & remove key • Personal locks: keep key • System locks: key placed in system lock box

  33. Field Disconnect Lockout Right Wrong

  34. Main Disconnect Lockout • This shows how a main disconnect should be locked and tagged.

  35. Motor Starter Lockout • This shows how a motor starter should be locked and tagged.

  36. Single Pole Circuit Breaker Lockout • This shows how a single pole circuit breaker should be locked and tagged.

  37. Double Pole CircuitBreaker Lockout • This shows how a double pole circuit breaker should be locked and tagged.

  38. Single Pole Switch Lockout • This shows how a single pole switch should be locked out and tagged.

  39. Cable Plug Lockout • This shows how a cable plug should be locked and tagged.

  40. Latch the Lock’s Shackle !! But don’t lock through another person’s lock !

  41. Independent Power Sources • Lock out all independent, related parts of unit or system being repaired • Valves: lock or chain • Tag & sign • Block parts that may drop, creep, drift or turn

  42. System Lockout • For related equipment groups • Provide marked locks & keys in lockable box in central location • Person in charge confirms all necessary equipment has its lock installed & key is returned to system box • Install personal locks on system box

  43. System Lock Boxes

  44. System Locks in Use #3 #1 #2

  45. Tagout

  46. Tryout • Verify & Test • Push “Start” switch • Equipment should not start • If equipment starts, shut down & verify proper equipment is locked out • If starts & proper equipment is locked out, warn, post guard & notify immediately

  47. Release Stored Energy • Block non-electrical devices that could release stored energy • Release spring, hydraulic or pneumatic pressures

  48. Machinery Guards • Keep them in place until: • Machine is stopped • Power supply de-energized • Padlocks installed by each person

  49. Start Up AuthorityAfter Repairs • Reinstall guards first • Do not start without authority & training • Communicate with co-workers and contractors • Be certain no one is in position to be injured

  50. Lock Removal • Personal lock to be removed only by person to whom it is issued • System locks may be removed by authorized persons

More Related