1 / 22

Congleton Public Realm Update 27/4/17 Fay Price Project Co-Ordinator Cheshire East Council

Congleton Public Realm Update 27/4/17 Fay Price Project Co-Ordinator Cheshire East Council. Introduction . Outcome of the Consultation Update on the Public Realm Scheme Next Steps. Review of consultation. 6 weeks consultation 26hrs of face to face contact

jamesgreer
Download Presentation

Congleton Public Realm Update 27/4/17 Fay Price Project Co-Ordinator Cheshire East Council

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Congleton Public Realm Update 27/4/17 Fay Price Project Co-Ordinator Cheshire East Council

  2. Introduction • Outcome of the Consultation • Update on the Public Realm Scheme • Next Steps

  3. Review of consultation • 6 weeks consultation • 26hrs of face to face contact • Over 1300 people saw the exhibition material in the street or at the Town Hall • Spoke with about 700 people • 292 Responses

  4. Consultation Results • 78% support for the concept design • 43% prefer colour palette 1 & 38% palette 2 • 61% prefer style 1 & 23% style 2

  5. Consultation Results (cont.) • Almost 62% want the Christmas tree to remain where it is • 197 comments • Top 10 themes

  6. Pedestrian Crossing Assessment • Crossing movements assessed • Formalised crossing requires formalised markings • New scheme provides a wider footway, informal crossing, slower approach speeds and narrowed road width

  7. Paving materials • Palette choice from Public Consultation Dk Grey Buff Red Silver

  8. Paving materials (Road at Swan Bank)

  9. Paving materials(Footway)

  10. Paving materials(Detail in front of Victoria St)

  11. Paving materials(Ribbon detail in various locations) Swan Bank In front of curved bench Central area Market St

  12. Paving materials(Road Surfacing at Market St / Moody St Junction)

  13. Street Furniture(Seating) • 8 New benches • Re-using 6 memorial benches • 5 additional benches • Curved bench at Swan Bank

  14. Street Furniture (Bollards)

  15. Street Furniture (Bins- inc recycling)

  16. Street Furniture (Planter)

  17. Street Furniture (Railings)

  18. Street Furniture (Cycle Stand) Swan Bank Between Crema and Superdrug Nr RBS at Market St end

  19. Street Furniture (Lighting) 3 Additional lights in Bridge St Uplighters in tree planters

  20. Re-using existing • Town map Street Furniture (Way finding)

  21. RBS Corner Flattening area Reclaimed Yorkstone Sunken electrical cabinet Railings Bench in front of wall

  22. Next Steps • Detailed Design complete • Materials on order • Contractors are bidding • Anticipated start at end of June • Programme estimated to be no more than 5 months to complete

More Related