1 / 20

Helmuth Fischer CBI

Helmuth Fischer CBI. 6 June 2006. Johannesburg. Assembly Plants. Thaboqwa. Hyqwa. Lesotho 1. Hylesedi. Lesotho 2. Market Segments and Products. Ratio Export/Total Sales. Export Sales by Region. Total Revenue Mix 2001 and 2006. Circuit Breakers for Equipment. Regional Markets

Download Presentation

Helmuth Fischer CBI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Helmuth FischerCBI 6 June 2006

  2. Johannesburg

  3. Assembly Plants Thaboqwa Hyqwa Lesotho 1 Hylesedi Lesotho 2

  4. Market Segments and Products

  5. Ratio Export/Total Sales

  6. Export Sales by Region

  7. Total Revenue Mix 2001 and 2006

  8. Circuit Breakers for Equipment • Regional Markets • First World, in the main around industrial hubs. • Developing countries do contract manufacturing. • In these cases First World determines standards, designs, specifications. • Products • Technology of our products provides benefits to customers. • Due to this some standard products are used in CBE applications. • Typical CBE products allow a multitude of variations.

  9. Circuit Breaker for EquipmentSales per Region

  10. CBE – Typical Market Segments

  11. GDFI Forecast: Growth Building Industry (%)(Source: Bureau for Economic Research) 06.06.2006

  12. Business Confidence Building Industry(Source: Bureau for Economic Research)

  13. Market Trends - Residential • 2005 vs 2004: • Increase in completed building plans of 50% in Flats and Town Houses • Decrease in dwellings <80m² • Real growth 11,8% p.a. in 2000-2005 • Forecast 8% p.a. in 2006-2011 • ESKOM rate of electrification has slowed down • Capital spend • Electricity spend ESKOM and Municipalities R50bn to 2010 • Housing National and Provincial R32bn to 2010 • Example • N2 Gateway project (W/Cape): 22 000 houses, so far only 770 complete, all with CBI products • W/Cape MEC stated by Dec 2006 16000 houses and 22000 serviced sites will be complete

  14. Market Trends – Mining • Local • Commodity prices up • Rand exchange rate positive • Inflation remaining low • Capital spend • Anglo American R36bn by 2009 • Anglo Platinum R20bn by 2007 • Impala Platinum R5bn by 2007 • Export • More mining activities accessible in Africa • Ghana, Namibia, Angola, Zambia

  15. Market Trends – Commercial/Utilities • Local • Real growth 2000-2005 3,9% p.a. • forecast 2006-2011 8,2% p.a. • Capital spend until 2010 • Examples • Gautrain R20bn • Sasol R12bn • Midrand expansion R11bn • Mittal R8bn • ACSA R5bn • Export • Congo Basin Hydro Electric Scheme 800MWatt 2012

  16. Lighting Typical Electrification Project Mini Sub-station Switchgear Power Cable Power Cable Power Cable Power Transformer Distribution Transformer Kiosk Switchgear Kiosk Switchgear Kiosk Switchgear Power Cable Distribution Board Residential Products Electricity Meter Prepayment/ Conventional Service Entry Switchgear Service Entry Switchgear Service Entry Switchgear Wiring Accessories House Wire Residential Dwelling

  17. Production since 2000

  18. Extra-ordinary Capex

  19. (MAR - FEB) 36 33 30 27 24 21 18 15 12 9 6 3 0 Yearly Imports Comparison% China Germany France Italy Japan 2004/2005 2005/2006