An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IRO-006-WECC-2Steve RueckertDirector of Standards Pre-Ballot Webinar Meeting November 20, 2012

  2. IRO-006-WECC-2 • Recognized need to modify to reflect revisions to the WECC Unscheduled Flow Mitigation Plan • Agreement that the changes were errata in nature • No revisions to who had to do what • Updates to references and removal of old table

  3. IRO-006-WECC-2 • WECC Board approved errata changes at the June 2012 WECC Board meeting • NERC Standards staff rejected the changes as errata at the July NERC Standards Committee meeting • NERC informed WECC we would have to take the changes through the WECC Reliability Standards Development Procedures

  4. IRO-006-WECC-2 • Posted for two comment periods • First required by WECC Procedures • Second a result of boiler plate type changes recommended by NERC during their review of the document • No significant comments or disagreements with the requirements of the standard • One comment on the effective date • Seeking approval of the revisions that the Board approved as errata

  5. Questions?