An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WECC Standards CommitteeJoint Session Webinar Meeting September 5, 2013

  2. System Performance Criteria - TPL-001-WECC-RBP-2 • SAR initiated in response to RCWG recommendations to RPIC • Tier 1 analysis conducted by RS • Evaluate and recommend how documents should be Categorized • Dependencies on other efforts • Scope of drafting effort • Timeline • Recommendation to WSC June 2013 • Retirement of WR1, WR2, WR4, WR5 • Project WECC-0100 SDT formed under WSC to determine disposition of WR3 and respond to comments from ballot.

  3. System Performance Criteria - TPL-001-WECC-RBP-2 RS prepared the document “WECC-0100 Tier 1 Evaluation and Recommendations” dated May 31, 2013

  4. TPL-001-WECC-RBP-2 ... WR1 • Requirement WR1 requires Planning Coordinators and Transmission Planners to comply with the WECC Disturbance Performance Table W-1 of allowable effects on other systems for all NERC TPL planning events. • Discussion – • New NERC TPL-001-4 Table 1 replaces Cat. A-C with P0-7. Expands contingency simulations and required performance. • NERC TPL-001-4 requirement R5 will require PC/TP’s to have criteria for ... transient voltage response. • Table W-1 more of a guideline today, 57 exceptions. • RS will be developing Vdip Guideline PC/TP’s will be able to use for NERC TPL-001-4 R5.

  5. TPL-001-WECC-RBP-2 ... WR1-R1.1 • The NERC Category C.5 initiating event of a single-line-to- ground fault with normal clearing shall also apply to the common mode contingency of two Adjacent Transmission Circuits on separate towers — unless the Mean Time Between Failure (MTBF) is determined to be greater than 30 years (i.e., outage frequency is less than 0.033 outages per year). • Discussion – • Double-circuit line outage rate 1.8 times two circuits on separate structures on common ROW. • Outage rate not on common ROW 1.4 times on common ROW. • Two circuits not on common ROW covered by NERC Table 1. • Recommendation to Retire

  6. TPL-001-WECC-RBP-2 ... WR1-R1.1 • Discussion Continued – • Outage comparison of circuits on common ROW and/or structures when 2 or more circuits went out of service. • From WECC Transmission Reliability Data.

  7. TPL-001-WECC-RBP-2 ... WR1-R1.2 • The common mode simultaneous outage of two generator units connected to the same switchyard, not addressed by the initiating events in NERC Category C, shall not result in cascading. • Discussion – • Common mode outage in the substation (breaker failures) already covered by NERC Table 1. • Interpretation is confusing. No known common mode outage between units on the generator side. • Recommendation to Retire

  8. TPL-001-WECC-RBP-2 ... WR1-R1.3 • The loss of multiple bus sections, as a result of a failure or delayed clearing of a bus tie or bus sectionalizing breaker, shall meet the performance specified for Category D of Table W-1. • Discussion – • Less stringent that existing NERC TPL-003, C.2 and C.9. • More definitive performance requirement in NERC TPL-001-4, Table 1, P.4. • Recommendation to Retire.

  9. TPL-001-WECC-RBP-2 ... WR1-R1.4 • For contingencies involving existing or planned facilities, the Table W-1 performance category can be adjusted based on actual or expected performance (e.g., event outage frequency and consideration of impact) after receiving Board approval to change the Performance Level Adjustment Record. • Discussion – • Historically used to adjust WR1.1 contingencies from Cat. C to D. Essentially an exception process for WR1.1. • Requirement for WECC Board approval retained in “Seven Step Process for Performance Category Upgrade Request “. • Recommendation to Retire.

  10. TPL-001-WECC-RBP-2 ... WR2 • Individual systems or a group of systems may apply requirements that differ from specific requirements in Table W-1 for internal impacts. If the individual requirements are less stringent, other systems are permitted to have the same impact on that part of the individual system for the same category of disturbance. If these requirements are more stringent, these requirements may not be imposed on other systems. • Discussion – • Policy statement tied to Table W-1, not a measurable Standard. • NERC TPL-001-4 Requirement R5 requires PC/TP’s to have criteria for ... transient voltage response. Results in similar study results to the intent of WR2. • Recommendation to Retire.

  11. TPL-001-WECC-RBP-2 ... WR3 • Reactive power resources, with a balance between static and dynamic characteristics, shall be planned and distributed throughout the interconnected transmission systems to ensure system performance... defines real power margin for Category A, B, and C contingencies. • Discussion – • The RS continues to discuss whether to reclassify this requirement as a Regional Standard or as a Guideline. Project WECC-0100 SDT formed to formulate a decision that will be balloted for wider approval. • Recommend to be addressed by SDT.

  12. TPL-001-WECC-RBP-2 ... WR4 • The Planning Coordinators and Transmission Planners shall meet the same performance category for unsuccessful reclosing, as that required for the initiating disturbance without reclosing. • Discussion – • Addressed by NERC TPL-001-4, R4.3.1.1 that states “The analysis shall include the impact of subsequent: Successful high speed reclosing and unsuccessful high speed reclosing into a fault where high speed reclosing is utilized.” • Recommendation to Retire.

  13. TPL-001-WECC-RBP-2 ... WR5 • For any event that has actually resulted in cascading, action must be taken so that future occurrences of the event will not result in cascading; or it must demonstrate that the Mean Time Between Failure (MTBF) is greater than 300 years (frequency less than 0.0033 outages/year) and approved by PCC. • Discussion – • NERC performance standards are deterministic and provide specific performance requirements for specific events. • Event reporting required by NERC EOP-004. Actual events are investigated by WECC, NERC, FERC or some combination. • Corrective actions required by NERC TOP-004-2 regardless of MTBF. • Recommendation to Retire.

  14. TPL-001-WECC-RBP-2 ... Retirement Ballot • Shall requirement WR1 including Table W-1be retired upon approval of a Voltage Performance Guideline? • Part 1.1 be retired effective on the date of WECC Board approval • Part 1.2 be retired effective on the date of WECC Board approval • Part 1.3 be retired effective on the date of WECC Board approval • Part 1.4 be retired effective on the date of WECC Board approval • Shall requirement WR2 be retired effective on the date of WECC Board approval? • Shall requirement WR4 be retired effective on the date of WECC Board approval? • Shall requirement WR5 be retired effective on the date of WECC Board approval?

  15. Review of Action Items

  16. Questions?