WECC Standards Committee Joint Session . Webinar Meeting September 5, 2013. WECC-0103. BAL-STD-002 Variance SAR initiated by Xcel Energy In case FERC approval of BAL-002-WECC-1 was delayed Add a variance to BAL-STD-002 permitting the use of specific Xcel resources as Spinning Reserve.

Download Presentation

WECC Standards Committee Joint Session

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Wecc standards committee joint session

WECC Standards CommitteeJoint Session

Webinar Meeting

September 5, 2013


Wecc 0103

WECC-0103

  • BAL-STD-002 Variance

    • SAR initiated by Xcel Energy

    • In case FERC approval of BAL-002-WECC-1 was delayed

    • Add a variance to BAL-STD-002 permitting the use of specific Xcel resources as Spinning Reserve


Wecc 01031

WECC-0103

  • Team Actions

    • Variance not needed

    • Changed WECC definition of “Spinning Reserve” to match NERC definition of “Operating Reserve – Spinning”

    • Fulfills WECC action item under FERC 740


Wecc 01032

WECC-0103

  • Dissenting Opinion

    • “on-line, unloaded generating capacity” language remains

    • Deseret suggested language itemizing additional resources (demand response, interruptible load, etc.)

    • DT concluded that these are included in the NERC definition


Definitions

Definitions

  • Spinning Reserve (WECC)

    • Means unloaded generation which is synchronized and ready to serve additional demand. It consists of Regulating reserve and Contingency reserve (as each are described in Sections B.a.i and ii).

  • Operating Reserve – Spinning (NERC)

    • The portion of Operating Reserve consisting of:

      Generation synchronized to the system and fully available to serve load within the Disturbance Recovery Period following the contingency event; or

      Load fully removable from the system within the Disturbance Recovery Period following the contingency event.