An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Front End Studies-International Design StudyMuon Collider David Neuffer January 2009

  2. Outline • Front End for the Neutrino Factory/MC • Concepts developed during study 2A • Concern on Vrf’ as function of Bsol • Need baseline design for IDS • need baseline for engineering study • ~lower fields; medium bunch length • Other variations

  3. Official IDS layout

  4. Optimization for IDS p p π→μ π→μ FE Target FE Target Solenoid Solenoid Drift Drift Buncher Buncher Rotator Rotator Cooler Cooler 10 m 10 m ~100 m ~50 m ~32m ~51m 36m 52m up to ~100m m up to ~100m m • ISS study based on nB = 18 (280 MeV/c to 154 MeV/c) • Buncher 0 to 12MV/m; Rotator 12.5MV/m, B=1.75T (201.25 MHz) • Long system, • Obtain shorter version has nB = 10 (280 MeV/c to 154 MeV/c) • slightly higher fields (2T, 15MV/m) • Shorter bunch train

  5. V’rf may be limited in B-fields baseline has ~2T, ~15MV/m Potential strategies: Use lower fields (V’, B) <10MV/m at 1.5T? Use non-B = constant lattices alternating solenoid Magnetically insulated cavities Shielded rf lattices Use gas-filled rf cavities but electron effects? Use Be Cavities should have better B/ V’rf Possible rf cavity limitations

  6. Shielded rf cooling channel (C. Rogers) • Lattice that keeps B small within rf cavities • Iron placed around coils • B < 0.25T at rf • Problems • rf occupancy ~1/3 • larger β* (~1m) • tranverse acceptance • Only in cooling section … • Still has fair cooling • increases μ/p by 1.7 3m rf cavity rf cavity

  7. Front End ReOptimization p π→μ FE Target Solenoid Drift Buncher Rotator Cooler 18.9 m ~60.7 m ~33m 42m up to ~100m m • Change reference B-field to 1.5T • constant B to end of rotator • changing to nB =“12” example • A bit longer than nB = 10 • optimize with lower fields • V’rf < 12 MV/m • Will see if we can get “better” optimum

  8. Parameters of candidate release • Initial drift from target to buncher is 79.6m • 18.9m (adiabatic ~20T to ~1.5T solenoid) • 60.7m (1.5T solenoid) • Buncher rf – 33m • 320  232 MHz • 0  9 MV/m (2/3 occupancy) • B=1.5T • Rotator rf -42m • 232  202 MHz • 12 MV/m (2/3 occupancy) • B=1.5T • Cooler (50 to 90m) • ASOL lattice, P0 = 232MeV/c, • Baseline has 15MV/m, 2 1.1 cm LiH absorbers /cell

  9. Some differences • Used ICOOL to set parameters • ACCEL model 10, • Phase Model 0 – • zero crossing set by tREFP 1 • refp 1 @ 233MeV/c, • 2 at 154MeV/c, 10 λ • Cool at 232 MeV/c • ~10% higher momentum • absorbers ~10% longer • Cools transverse emittance from 0.017 to 0.006m μ/8 GeV p 0.08 0.00

  10. Beam Through System z=80m z=0 z=156m z=111m ∆n=10 z=236m

  11. Varying Buncher/Rotator Voltage • Vary buncher/rotator gradients from baseline to explore sensitivity to gradient limits. • same baseline cooling channel (16MV/m, 1.15cm LiH) • 15 MV/m -> 1.1cm Li H • Somewhat less sensitive than previous cases

  12. More realistic models • For buncher & rotator replace B=1.5T with “realistic” solenoid coils • (B ~1.5T) • 0.5 m long, 0.25m spacing • ~OK for rf feed in between • ICOOL simulation shows no change in performance • (<~1%) • Next: rf • smaller number of rffrequencies • 14 ,B 16 R rf freq. OK • 7,8 20% less • Set rf power requirements

  13. rf requirements • Buncher – 13 rf frequencies • 319.63, 305.56, 293.93,285.46, 278.59, 272.05, 265.80, 259.83, 254.13, 248.67, 243.44, 238.42, 233.61 (13 f) • ~100MV total • Rotator – 15 rf frequencies • 230.19, 226.13, 222.59, 219.48, 216.76, 214.37,212.28, 210.46,208.64, 206.90, 205.49,204.25, 203.26, 202.63,202.33 (15 f) • 336MV total, 56 rf cavities • Cooler • 201.25MHz –up to 75m ~750MV • ~15 MV/m, 100 rf cavities

  14. Buncher rf cavity requirements RF frequency Total voltage cavities Gradient Rf Power 319.63 1.368 1 (0.4m) 4 MV/m 305.56 3.915 2 (0.4m) 5MV/m 293.93 3.336 2 (0.45m) 4 MV/m 285.46 4.803 2 (0.45m) 5.5MV/m 278.59 5.724 2 (0.45m) 6.4 MV/m 272.05 6.664 3 (0.45m) 5MV/m 265.80 7.565 3 (0.45m) 5.7MV/m 259.83 8.484 3 (0.45m) 6.5MV/m 254.13 9.405 3 (0.45m) 7MV/m 2.25 248.67 10.326 4 (0.45m) 6MV/m 243.44 11.225 4(0.45m) 6.5MV/m 238.42 12.16 4 (0.45m) 7MV/m 233.61 13.11 4 (0.45m) 7.5MV/m 3.5 98.085 0.2 0.6 0.5 1.0 1.25 1.5 1.5 2 2.25 2.5 3 MW

  15. Rf Rotator/ Cooler requirements • RF Rotator • 56 cavities (15 frequencies) • 12 MV/m, 0.5m • ~2.5MW (peak power) per cavity • Cooling System – 201.25 MHz • 100 0.5m cavities (75m cooler), 15MV/m • ~5MW /cavity

  16. Add Windows effects • ISS had windows … • 200μ Be – 7MV/m cavities • (0.12 MeV energy loss) • 395 μ Be – 10MV/m cavities • (0.24 MeV energy loss) • 750 μ Be – 12.5MV/m cavities (Rotator) • (0.45 MeV energy loss) • MICE rf cavities • 380 μ Be window design • For IDS ?? • Use 200 μ Be for Buncher • Use 400 μ Be for Rotator • Could use Be-grid or “open-cell” ?

  17. How Long a Bunch Train for IDS? • ISS study alotted space for 80 bunches (120m long train) • 80m or 54 bunches is probably plenty Study 2A ~80m -20 100 nB =12 ~60m 40 -30

  18. From Juan G.’s studies 8GeV 20T beam from H. Kirk Also 8GeV 30T beam New H. Kirk initial beam 20 T, 8 GeV beam, Hg target from more recent MARS (?)– (subtract 2.9ns to get mean of 0) more π/8GeV p (~10%) Tried 30T initial beam scaled 20 to 1.5T to 30 to 2.25 to 1.5T ~20 to 25% more than with 20T Recent Studies

  19. Plans etc. • Move toward “realistic” configuration • add Be windows • Set up design for cost algorithm • rf cavity design (pillbox, dielectric) • rf power requirements • Magnet design • Continuing front end IDS design study • C. Rogers, G. Prior, D. Neuffer, C. Yoshikawa, K. Yonehara, Y. Alexahin, M. Popovic, Y. Torun, S. Berg, J. Gallardo, D. Stratakis … • ~Biweekly phone Conference • Cost meeting at CERN March • April at Fermilab (IDS meeting)

  20. Quasi-Isochronous Muon Capture • Front end with isochronous HCC • 2009 SBIR w C. Yoshikawa

  21. U Miss reminds me of my university days

  22. Study2B June 2004 scenario (ISS) • Drift –110.7m • Bunch -51m • 12 rf freq., 110MV • 330 MHz  230MHz • -E Rotate – 54m –(416MV total) • 15 rf freq. 230 202 MHz • P1=280 , P2=154NV = 18.032 • Match and cool (80m) • 0.75 m cells, 0.02m LiH • Captures both μ+ and μ- • ~0.2μ/(24 GeV p)