LVPS update L.Jirden 6.10.05

LVPS update L.Jirden 6.10.05. For each type: ALICE Users Acceptance tests Open issues Orders. Wiener PL500/F12. ALICE users: TPC, TRD, MTK, MTG Acceptance tests (ESS grp) Electrical + B-field tests finished ok output voltage limitation tbd, not yet delivered Radiation: tbd

hedy
Download Presentation

LVPS update L.Jirden 6.10.05

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LVPS updateL.Jirden 6.10.05 For each type: • ALICE Users • Acceptance tests • Open issues • Orders L.Jirden DCS workshop 6.10.05

  2. Wiener PL500/F12 • ALICE users: • TPC, TRD, MTK, MTG • Acceptance tests (ESS grp) • Electrical + B-field tests • finished ok • output voltage limitation tbd, not yet delivered • Radiation: tbd • Software (IT): started, OPC delivered a few days ago • Detector (electrical) tests: • TPC:100A, 200A modules: started (L.Musa) • TRD:100A, 250A modules: not done • MTK: 100A modules: planned • MTG: 25A, 100A modules: not done L.Jirden DCS workshop 6.10.05

  3. Wiener PL500/F12 • Open issues • Output Voltage limitation: • Being implemented by Wiener, delivery Nov 05 • Watchdog function • Improvements to be done by Wiener • Development & delivery Spring 06 • Output Voltage connections • Patch panel to be designed/implemented: ESS/ACC (S.Sellitto)/detectors • Water cooling connections • Connection solution (back/front) to be found: ESS/ALICE • Flow/pressure sensor needed: ACC (S.Sellitto) • OPC • Tests with final F12 version to be done L.Jirden DCS workshop 6.10.05

  4. to cable screens PL500/F12 output connections to rack mechanics to metal case power bin power box Stiff output cable output studs Flexible patch cables Patch panel fixed toDIN rail or similar L.Jirden DCS workshop 6.10.05

  5. Wiener PL500/F12: sample/final orders L.Jirden DCS workshop 6.10.05

  6. Caen EASY system • ALICE users: • SPD, FMD, PMD • SSD, HMPID: non-cern contracts • Acceptance tests (ESS grp) • Electrical tests: ongoing • B-field: done ok • Radiation: tbd • Software (IT): ongoing (see SP presentation) • Detector (electrical) tests: • SPD:10A modules: done ok? • HMPID:10A, 25A modules: done ok? • SSD:new special module: done ok? • FMD: 10A modules: no tests done yet? • PMD: 10A, 16A, 25A modules no tests done yet? L.Jirden DCS workshop 6.10.05

  7. Caen EASY system • Open issues • A3486 AC/DC module, • PFC: required 0.9; measured 0.73 • Harmonic rejection: out of specification • CAEN suggests filter unit in CR • Output connectors • Unreliable – need to be changed L.Jirden DCS workshop 6.10.05

  8. Caen EASY system: sample/final orders L.Jirden DCS workshop 6.10.05

  9. Caen SY1527 • ALICE users: V0 + T0 • Acceptance tests (ESS) • No tests: existing standard product • Detector (electrical) tests: • V0:16A modules: not done? • T0:16A modules: not done? • Open issues • None; PS in CR4: long cables L.Jirden DCS workshop 6.10.05

  10. Caen SY1527sample/final orders L.Jirden DCS workshop 6.10.05

  11. Caen SASY system • ALICE users: TOF non-CERN contract • Acceptance tests (ESS): No tests • TOF tests: • SY1527 + Branch Controller (in UX) • B-field: no ventilators, special arrangement, ok? • MACHISTE (in UX) • Electrical: PFC, EMC done ok? • B-field: no ventilators, done ok? • DC/DC (on detector): • Electrical: done ok • B-field: done ok • Radiation: done ok? • Open issues • ? L.Jirden DCS workshop 6.10.05

  12. Caen SASYsample/final orders L.Jirden DCS workshop 6.10.05

  13. AREM Pro • ALICE user: SDD - non-CERN contract • Acceptance tests (ESS): No tests • SDD tests: • Electrical: done ok? • B-field: no ventilators,done ok • Software: ? • Open issues • ? L.Jirden DCS workshop 6.10.05

  14. LV PS Procurement – Status C.Parkman ESS Group October 6, 2005

  15. July 16 2004 Market Survey closing 5 companies qualified January 3 Call for tender sent out February 14 Call for tender closing February 22 Call for tender opening March Approval given by LECC Suppliers (Wiener & CAEN) formally notified Frame contract negotiations End April First samples ordered July Sample testing starts Contracts signed Conditional on test results August & September Electrical and magnetic field tolerance tests Additional samples ordered for experiments October & November Radiation tolerance tests TID, SEQ 24 Oct. Uppsala NIEL End Nov. Prospero, Dijon Production quantities Waiting on result of approval tests PH-ESS will sign-off item by item to reduce delays LV PS Procurement Schedule L.Jirden DCS workshop 6.10.05

  16. Wiener approval tests • Equipment under test • 0M22.0003 • 3U 19" power box, 385VDC input, 12 channel DC output, 2-8V, 300W nominal, 55A max, 50A continuous, analogue controlled interface. • Water cooled, no magnetic screening  • 0M24.0003 • 3U 19" power box, 385VDC input, 12 channel DC output, 2-8V, 300W nominal, 55A max, 50A continuous, analogue controlled interface. • Water cooled, magnetic screened.  • 0M12.0003 • 3U 19" power box, 385VDC input, 12 channel DC output, 2-8V, 300W nominal, 55A max, 50A continuous, analogue controlled interface • 0PFC.0000 • Primary rectifier module, input 230V 50Hz, output 385VDC (nominal) • Load power 3.5kW (nominal)  • 0B07.0000 • Card-cage for up to 6 primary rectifier modules. • 0R00.0000 • Control and monitoring module RCM, 6U VME format (power-only). Controls 12 power channels • 0M11.0000 • Monolithic 3U 19" power box, 230V 50Hz PFC input, 12 channel DC output, 2-8V, 90W nominal, 11.5A max, 10A continuous, Ethernet control  • 0M11.0003 • Monolithic 3U 19" power box, 230V 50Hz PFC input, 12 channel DC output, 2-8V, 300W nominal, 55A max, 50A continuous, Ethernet control.    • 0B15.1200 • Power Bin MARA 3U 300W/channel • 0B14.2400 • Power Bin MARA 6U 300W/channel “Maraton” “F12” Concerns ALICE L.Jirden DCS workshop 6.10.05

  17. Wiener status • “Maraton” • Electrical tests look promising • Magnetic field tolerance according to specification • Radiation tests to be done • “F12” • Electrical tests to be done • Tests on an early prototype were positive • Final tests scheduled for end-2005 • Remaining issues • Connectivity • Cables and connectors for the Maraton 385VDC connection • DC output cable management • Need for patch panels • CE conformity • Wiener waiting on CERN’s choice of cable for Maraton interconnection • Other, minor details • No “show-stoppers” L.Jirden DCS workshop 6.10.05

  18. CAEN approval tests • Equipment under test • A3009 • 12 channels, 8V / 9A / 45W • A3016 • 6 channels, 8V / 16A / 90W • A3025 • 4 channels, 8V / 25A / 150W • A3050 • 2 channels, 8V / 50A / 300W • A3100 • 1 channel, 8V / 100A / 600W • A3486 • 220/400 VAC 3-phase input, 48VDC, 4kW output • A1676A • EASY Branch Controller • EASY3000 crate Internally identical L.Jirden DCS workshop 6.10.05

  19. CAEN status • A3009, A3025, A3050, A3100, A3486, A1676A • Initial electrical tests made • Further tests required • A3016 still to be tested • Magnetic field tolerance according to specification • Radiation tests to be done • Remaining issues • Power factor and harmonic rejection • Out of specification • CAEN propose a (non rad/mag-tol) passive filter before the A3486 • Requires installation space in the counting room • PH-ESS waiting for a test sample • Connectivity • Connectors as delivered on the samples are unreliable • Screw terminals available as an option • Construction • Use of non-halogen free insulation in samples • CE conformity L.Jirden DCS workshop 6.10.05