1 / 16

Experience and plans from running the (SCT) DAQ

HEP. Experience and plans from running the (SCT) DAQ. Setting things up Calibration mode operations Physics mode operation Transitions Recovery Modifying configurations. What to do better?. The good news!. Overview. Almost all things were possible with enough expert hands at the wheel

hayes
Download Presentation

Experience and plans from running the (SCT) DAQ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HEP Experience and plans from running the (SCT) DAQ • Setting things up • Calibration mode operations • Physics mode operation • Transitions • Recovery • Modifying configurations What to dobetter? Alan Barr - SCT DAQ

  2. The good news! Alan Barr - SCT DAQ

  3. Overview • Almost all things were possible with enough expert hands at the wheel • Focus is on what could be improved to make life easier, and to reduce down-time Alan Barr - SCT DAQ

  4. Setting things up • Various mapping scans now in place: streamline checking for mapping errors • TX  RX (autoconfig) • TX  Module (Trim -> TV50 RMS) • RX  DCS (Hard reset scan) • Perhaps a case for a 1-Pt QCAL scan test at “physics threshold” – look at trim? • Opto tuning – improvements to algorithms • Hard reset between bins for TX current • Rx Threshold algorithm improved • Still some worries over marginal TX. Alan Barr - SCT DAQ

  5. Timing-in • Good to ~few ns gross timing done by looking for top/bottom of module co-incidence • Combining statistics between modules • Relatively few stats required • (few hundred cosmics) • Good agreement with “offline monitoring” • Module  module done by dead reckoning (at SR1) Alan Barr - SCT DAQ

  6. Mark/Space Ratio(Clock jitter in TX) • Test done for several rods in SR1 sector – enough stats to test algorithm • Generally seems to work • Slow • Some funny channels • Investigations into BOC plugins proceeding • Some improvements in algorithm made to attempt to flag outlying cases Alan Barr - SCT DAQ

  7. Calibration mode • Can “do the job” • New response curve taken and used for SR1 cosmics tests • Less fault tolerant to errors from modules • Still aborts after single module failure • To be improved? • Would benefit from tools to do statistics on different modules • Nasty fudge used to combine data for timing scan • Need to be able to compare against reference set rather than just labelling “good”/”bad” modules Alan Barr - SCT DAQ

  8. Things to speed up calibration? • Diagnostics from DSP greatly improved • Pick out which modules are causing problems • Improved fault tolerance? • Decrease wasted down-time. • Has histogram read-out slowed down? • If so where? ROD? Network? NFS demon? • Quick turn-around with updated configuration (see later) • Could pack trims better to reduce configuration loading to ROD by factor of ~2. • Simultaneous change needed to DSP code and to SctRodDaq Alan Barr - SCT DAQ

  9. Physics mode • Standard operation of SCT HW/SW eventually good • Couldn’t read out histograms during physics mode when running • And slow when paused • Runs able to continue for several hours. • What stopped “good” runs? • Crash of ROS/FILAR • Formatter allowing “illegal” data through? • LV trips from SCT modules • Reduce frequency • Recover • Occasionally loss of synchronisation with TRT? • Identify • Add counter resets Alan Barr - SCT DAQ

  10. Non-expert operation? • Work to be done in: • Detector safety (DCS) • Module initialisation • Module recovery • Information in error messages • Getting configurations to offline • Feedback on synchronisation • Other “error” states • Recovery time after power failure was I think ~ 8 hours? Alan Barr - SCT DAQ

  11. Transitions • Physics  Calibration transition ok for SCT alone • Cal. couldn’t be done in configuration containing TRT • Taking out subdetector involved lots of different resources (EventBuilder, ROS, RODs, …) • I thinkTDAQ has a way to streamline this? Alan Barr - SCT DAQ

  12. Configuration tools • SR1 highlighted the need for tools to compare, update and merge configurations. • Chris and Bruce produced/working on some tools for xml. • ‘Final’ database configuration solution now has same functionality as xml. • GUI display of configuration parameters? Alan Barr - SCT DAQ

  13. Headaches • ROS machine failure • Required reboot, remount, … • Possibly linked to invalid data coming from ROD • Some ideas as to what might be the cause… • Occasional initialisation problems in SctRodDaq start-up • Not really investigated – replace delays in synch-init? • “Full” ROD (inc. s-link) reset seems to require crate reboot (slow!) • What isn’t reset on “reset”? • Module start up needs Hard Reset, and then send configs automated. • Problem: DCS hand-shaking • Automation of module power cycle required (from DAQ) Alan Barr - SCT DAQ

  14. Issues for the pit • Configuration (inc. DCS) still a big area • First large-scale multi-crate test • Parallelism needed for analysis • Much harder to reset off-detector hardware! • Auto recovery required for • Modules • OPTO • DAQ systems • Can we still use NFS for data transfer? • Auto-archival to CASTOR through firewall? • Set up of trigger chain (resets etc) through LTPs. • ROD monitoring not physics-ready Alan Barr - SCT DAQ

  15. If things don’t work • Don’t just grumble to yourself… • Grumble to the experts! • Wiki page: • http://www.hep.phy.cam.ac.uk/daq-bin/wiki.cgi/UserStories • Email address: • atlas-project-sctroddaq@cern.ch • We rarely bite and will endeavour to help! Alan Barr - SCT DAQ

  16. The good news! Alan Barr - SCT DAQ

More Related