An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J.COLLINS CENTER FOR PUBLIC MANAGEMENT

  2. Methodology • Conducted interviews: • Building Studies Committee • Fire Chief • Police Chief • Treasurer • Financial Advisor • Review documentation: • Building and site plans • Presentations on existing conditions • Cost estimates • Debt service schedules • Tours of Fire Station, Police Station, potential sites

  3. Study Components • Siting of facilities • Funding plan • Recommendations

  4. Siting Plan • Build new Fire Station and Fire Training Center at 99 Main Street. • Demolish existing Fire Station and build new front section for use by police at 112 Main Street. • Renovate rear part of building to complete the Police Station.

  5. Siting Findings • Current facilities do not meet needs of modern fire or police departments. Findings include: • Apparatus bays and storage areas at the Central Fire Station were not built for the fire trucks and firefighting equipment commonly in use today. • The Central Fire Station does not meet the current operating needs of the Department. • The existing firefighter Training Center is an important element to the Department’s operation and helps ensure that Carver firefighters are highly trained.

  6. Siting Findings (continued) • The layout of the existing Police Station is substandard and the building is poorly maintained. • Neither Police Station nor Fire Station provide climate-controlled storage for servers and other electronic equipment, likely reducing usable lifetime and potentially resulting in loss of important data. • Spaces that could be reasonably accessed by members of the public and non-sworn staff are not ADA compliant.

  7. Siting Findings (continued) • 99 Main Street offers best available location for new Fire Station / Training Facility and existing site at 112 Main Street for Police Station. Findings include: • Existing site very small for Fire Department and would require interim location for police and fire departments; will continue to conflict with adjacent uses; • Center Street property constrained by Town wells; visibility issues at likely ingress and egress point; • Other Town-owned properties are either too small, too wet, located off of the Main Street N-S spine, or used for public park

  8. Siting Recommendations • During design, consider the need for proposed community room / training room on first floor of new Fire Station. • Consider location of spaces for bedrooms and bathrooms for firefighters to ensure reasonable privacy. • Consider long term staffing needs of Police Department. • Make some modest, short term improvements in Police Station.

  9. Funding Background • Cost Estimates: • Fire Station - $8,169,700 • Fire Training Center - $578,000 • Police Station - $7,510,000 (FY2017 start) • Existing debt for Town Hall and Library will be paid in FY2017 • Since 2011, Town has increasingly added funds from the tax levy to the Capital Building Stabilization Fund (CBSF)

  10. Funding Plan • Continue appropriations to the Capital Buildings Stabilization Fund to pay for future debt service: • $400,000 plus 2 ½% annually • Additional allocation from new growth taxes added to base • Appropriate drop off in town hall/library debt payment

  11. Funding Findings • Capital Building Stabilization Fund balance as of July 1, 2013 is $580,001, with $400,000 appropriated at past town meeting • Beginning allocation of $55,688 of new growth taxes based on 13 year average is conservative • Town Hall/Library debt drops from $278,561 in FY2014 to $0 in FY2018 • Annual debt service for Fire/Police facilities peaks at between $1.1 to $1.3 million in FY2019 with 25 year example • Utilization of CBSF appropriations covers debt while building balance for future use • Z

  12. Funding Recommendations • FY2015 annual town meeting appropriate approximately $476,800 to CBSF for future debt service payments • Future town meetings increase appropriations to CBSF based on funding model- requires 2/3 vote • Future town meetings appropriate funds from the CBSF to debt service account equal to debt service costs for Fire and Police facilities– requires 2/3 vote

  13. Conclusions • The Collins Center finds that: • Proposed siting plan for the fire and police facilities represents best option available to meet department needs. • Debt service could be covered via proposed funding strategy while maintaining conservative capacity for other operating budget needs.