The *rebirth* of Troutt Hall’s network room ( a.k.a. Black Diamond upgrade )

The *rebirth* of Troutt Hall’s network room ( a.k.a. Black Diamond upgrade ). USAO – May 2009. Yup, that’s how to used to be…! (1). The old Black Diamond is underneath that mess of cables and switches! (2). On the right is where the new rack is going to be installed (3).

faunus
Download Presentation

The *rebirth* of Troutt Hall’s network room ( a.k.a. Black Diamond upgrade )

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The *rebirth* of Troutt Hall’s network room (a.k.a. Black Diamond upgrade) USAO – May 2009

  2. Yup, that’s how to used to be…! (1) The old Black Diamond is underneath that mess of cables and switches! (2)

  3. On the right is where the new rack is going to be installed (3) Black Diamond upgrade project (4)

  4. Old patch cables have been removed from the ethernet patch panel! That door is finally closed (6) The ethernet patch panel’s door has not been closed in almost a decade….. (5)

  5. The new rack and Black Diamond has been installed! (7) All fiber-optic cables have been run from the fiber-optic patch panel to the switches (8)

  6. Black Diamond upgrade project (10) All the switches have been installed on the new rack (9)

  7. New longer patch cables have been run from the ethernet patch panel to the switches on the rack! (11) Black Diamond upgrade project (12)

  8. Black Diamond upgrade project (13) Covers attached to the cable managers to hide the cable runs (14)

  9. All the new patch cable runs behind the new rack (16) New patch cables from the switches have been plugged in to the ethernet patch panel (15)

  10. The OLD Black Diamond has been removed! (17) Almost done…. (18)

  11. New Black Diamond is operational! (19) PSU cover is installed on the new Black Diamond (20)

  12. POE injector has been removed (replaced with POE-capable switch) and additional UPS has been added (21) Black Diamond upgrade project (22)